Similar Projects
Heat Treat Services
Bidding
CO

HVAC - CRAC Re-Acq
Post-Bid
Colorado Springs, CO 80916

HVAC-CRAC ReAcq Synopsis
Post-Bid
$50,000 to $9,990,000 est. value
Colorado Springs, CO 80914

Sustain Repair Air Handler Units - West Fairchild Hall
Results
$1,000,000 to $5,000,000 est. value
Black Forest, CO 80840

Repair HVAC Harmon Hall Arnold Hall
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO 80840

Replace Rooftop Air Condenser Unit
Post-Bid
Colorado Springs, CO

Cooling Tower Repairs and Renovations
Results
Less than $50,000 est. value
Colorado Springs, CO 80906

Building 1840 Computer Room Air Conditioner (CRAC) Replacement
Post-Bid
Colorado Springs, CO 80916

CM Engineering and Applied Science Building Chiller Plant Upgrades
Results
Colorado Springs, CO 80918

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Centennial Hall HVAC Upgrade
Results
Colorado Springs, CO

Pioneers Museum Offsite Storage HVAC Upgrade
Post-Bid
Colorado Springs, CO 80903

Blast Booth, Media Reclaim System, and Dust Collection System Cleaning
Results
Colorado Springs, CO 80914

Improvements to the HVAC System Windows and Indoor Air Quality Berg Building
Post-Bid
Less than $1,417,414 est. value
Colorado Springs, CO 80900

Repair Chemical Feeders for Heating and Chilled Water Systems
Results
Colorado Springs, CO 80914

Reported 03/13/2021 12:00 AM
Project Title

2019-056M19 / Replace Campus Domestic Hot Water System

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $747,089
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Add Alternate #1: Provide new digital thermostatic mixing valve and recirculation pump to serve Palmer Hall. Add Alternate #2: Provide new, digital thermostatic mixing valve to serve existing domestic hot water system in Adams Hall. OSA-AFB-1 REV 7/2020 Add Alternate #3: Point-of-Use thermostatic mixing valves to all existing hot water plumbing fixtures within the following buildings; Brown, Palmer, and Ritter. Add Alternate #4: Point-of-Use thermostatic mixing valves to all existing hot water plumbing fixtures within the following buildings; Adams, Administration, Argo, EEC, Gottlieb, Industrial, Jones, Steam Plant, and West Hall. Add Alternate #5: Provide new, upsized domestic hot water supply piping, add new hot water return piping to serve Steam Plant. Add new, digital thermostatic mixing valve. Add new recirculation pump to serve hot water fixtures in building. Add Alternate #6: Provide new domestic hot water return piping from existing hot water plumbing fixtures in Industrial Building to new recirculation pump and digital thermostatic mixing valve located in steam tunnels. Add Alternate #7: Currently, Gymnasium uses existing electric water heaters. Provide new domestic hot water supply and return piping to serve Gymnasium. Tie new into piping at EEC from the heat exchanger in Argo. Replace the existing thermostatic mixing valve and recirculation pump to serve the Gymnasium.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents