Similar Projects
Red Rock Tainter and Sluice Gate Rehabilitation
Infrastructure
Bidding
$25,000,000 CJ est. value
Pella, IA 50219

Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Post-Bid
$10,000,000 to $25,000,000 est. value

East Interchange Infrastructure Improvements – 250th Avenue Improvements
Infrastructure
Results
Pella, IA

PCC Pavement - New
Infrastructure
Results
IA

PCC Patching - G28
Infrastructure
Results
IA

2022 Street Improvements
Renovation, Infrastructure - 109,998 SF
Results
$928,313 est. value
Knoxville, IA

Hma Resurfacing with Milling
Infrastructure
Results
IA

PCC Patching
Infrastructure
Results

Granular Surfacing of Roadway
Infrastructure
Results

250th Avenue Reconstruction
Infrastructure
Results
$429,776 est. value
Pella, IA 50219

Bos Landen Drive Reconstruction
Infrastructure
Results
Pella, IA 50219

Prairie Street Improvements
Infrastructure
Results
$736,153 est. value
Pella, IA

Old City Hall Alley Reconstruction
Infrastructure
Results
$450,204 est. value
Pella, IA 50219

Pella Community School District - Early Childhood Center Early Sitework - Bid Package #31 - Grading Bid Package #32 - Concrete Paving
Infrastructure
Results
Pella, IA 50219

Apron Expansion Pella Municipal Airport
Addition, Demolition, Infrastructure
Results
$565,543 CJ est. value
Pella, IA 50219

Last Updated 07/28/2022 04:32 PM
Project Title

W. Washington Street and Fifield Road Intersection Improvements

Physical Address View project details and contacts
City, State (County) Pella, IA 50219   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $291,255 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the W. Washington Street and Fifield Road Intersection Improvements project, and work incidental thereto, as described in the plans and specifications therefore, now on file in the office of the City Clerk Construct W. Washington Street and Fifield Road Intersection Improvements including all labor, material and equipment to install approximately 487 square yards of 8-inch thick PCC pavement, grading, modified subbase, granular shoulder, surface restoration, and miscellaneous associated work, including cleanup. The W. Washington Street and Fifield Road Intersection Improvements is located on W. Washington Street and Fifield Road in the City of Pella. All work and materials are to be in accordance with the proposed plans, specifications, form of contract and estimate of cost now on file in the office of the City Clerk of Pella, Iowa, and by this reference made a part thereof as though fully set out and incorporated herein. All proposals and bids in connection therewith shall be submitted to the City Clerk of said City on or before the time herein set for receiving bids. All proposals shall be made on official bidding blanks furnished by the City, and any alterations in the official form of proposal will entitle the Council, at its option, to reject the proposal involved from consideration. Each proposal shall be sealed and plainly identified. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of ten percent (10%) of the bid. The bid security should be made payable to THE CITY OF PELLA, IOWA. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and other contract documents. Bidders shall use the bid bond form found in the specifications. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. The Council reserves the right to defer acceptance of any proposal for a period not to exceed thirty (30) calendar days from the deadline for submission of bids. Electronic bidding is not available for this project The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council. The work shall commence within ten (10) days after written Notice to Proceed and shall be completed no later than November 30, 2022. Liquidated damages in the amount of Three Hundred Dollars ($300.00) per calendar day may be assessed for each day the project is not completed. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. At least ten (10) days before each progress payment falls due (but not more often than once a month), the Contractor will submit to the Engineer a partial payment estimate filled out and signed by the Contractor covering the work performed during the period covered by the partial payment estimate and supported by such data as the Engineer may reasonably require. If payment is requested on the basis of materials and equipment not incorporated in the work but delivered and suitably stored at or near the site, the partial payment estimate shall also be accompanied by such supporting data, satisfactory to the Owner, as will establish the Owner's title to the material and equipment. The Engineer will, within fifteen (15) days after receipt of each partial payment estimate, either indicate in writing his approval of payment and present the partial payment estimate to the Owner, or return the partial payment estimate to the Contractor indicating in writing his reasons for refusing to approve payment. In the latter case, the Contractor may make the necessary corrections and resubmit the partial payment estimate. The Owner will, within thirty (30) days of presentation to him of an approved partial payment estimate, pay the Contractor a progress payment on the basis of the approved partial payment estimate. The Council reserves the right to reject any or all bids and to waive informalities or technicalities in any bid.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents