Similar Projects
Bridge Replacement, Other Construction
Demolition, New Construction, Infrastructure
Design
$1,543,073 CJ est. value
Lynn, IN 47355

Bridge Replacement, Other Construction
Demolition, New Construction, Infrastructure
Design
$1,543,073 CJ est. value
Lynn, IN 47355

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Community Crossing Paving Program
Infrastructure
Bidding
$200,000 CJ est. value
Winchester, IN 47394

2022 Street Resurfacing Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Union City, IN 47390

2022 Street Resurfacing Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Union City, IN 47390

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Asphalt Resurface
Infrastructure
Results
IN

Winchester Vision Park/North Town Sub Phase 2 Water and Sewer Extension
Infrastructure
Post-Bid
$200,000 CJ est. value
Winchester, IN 47394

CCMG Parker City
Infrastructure
Results
$183,740 est. value
Parker City, IN

Orphan Wells - Randolph, Blackford, Jay, Adams, and Allen Counties
Infrastructure
Post-Bid
$225,000 CJ est. value
Winchester, IN 47394

Industrial Drive Reconstruction
Infrastructure
Results
$437,783 est. value
Lynn, IN 47355

Morris and Hickory Reconstruction
Infrastructure
Results
$341,896 est. value
Farmland, IN

Union City - Governor Isaac P Gray Addition - Phase 1 Subdivision Project
Infrastructure
Results
Union City, IN

Monroe Center ES Paving
Alteration
Results
$200,000 est. value
Parker City, IN 47368

Last Updated 02/20/2023 10:02 PM
Project Title

2022-2 CCMG Parker City Project

Physical Address View project details and contacts
City, State (County) Parker City, IN 47368   (Randolph County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $247,839 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For 2022-2 CCMG Parker City Project The conversion of East Street in Parker City from gravel to asphalt. THIS PROJECT CONSISTS OF THE RESURFACING OF NORTH FULTON STREET, DIVISION STREET, AND OAK STREET. EAST STREET WILL ALSO BE CONVERTED FROM A GRAVEL ROADWAY TO ASPHALT. STORM DRAINAGE WILL ALSO BE INSTALLED ALONG EAST STREET The Project includes the following Work: The conversion of East Street in Parker City from gravel to asphalt. Bidder must submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Project Manager, (Luke T. Hemmelgarn), (lth@choiceoneengineering.com). If no response within 24 hours call (937-497-0200)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents