Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Osterburg Scrubgrass Creek
Infrastructure, Renovation
Design
$3,399,179 CJ est. value
Osterburg, PA 16667

Osterburg Scrubgrass Creek
Infrastructure, Renovation
Design
$3,399,179 CJ est. value
Osterburg, PA 16667

2023 Bedford County Bridge Preservation
Infrastructure
Bidding
$2,500,000 CJ est. value
Bedford, PA 15522

2023 Bedford County Bridge Preservation
Infrastructure
Bidding
$2,500,000 CJ est. value
Bedford, PA 15522

Asphalt Resurfacing
Infrastructure
Post-Bid
PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

T-575 Cold Spring Road Bridge
New Construction, Infrastructure
Results
$500,000 to $999,999 est. value
PA

PA 56 Pleasantville Mountain Safety Improvements
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
PA

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

PA 56 - Rouzer Rd to SR 4030
Infrastructure
Design
$8,692,000 CJ est. value
Lincoln Township, PA 15521

Blacktop paving at the Everett Area Middle/High School Stadium
Infrastructure
Bidding
$304,000 CJ est. value
Everett, PA 15537

Belden Road Bridge Replacement
New Construction, Infrastructure
Post-Bid
Bedford, PA 15522

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

Last Updated 03/02/2023 07:32 AM
Project Title

Gordon Creek Bridge

Physical Address View project details and contacts
City, State (County) Lincoln Township, PA 15521   (Bedford County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $1,531,100 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Quaker Valley Road (PA 56) over Gordon Creek in West St. Clair Township, Bedford County. Primary Improvement Type: Bridge Improvement As of March 02, 2023, the project is In development stage. Anticipated letting date is September 12, 2024. PennDOT - Gordon Creek Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents