Similar Projects
Solar Energy Grounding Transformer
Term Contract
Sub-Bidding
Fort Collins, CO 80523

Merchandisers & Work Tables - Kitchen Equipment
Term Contract
Sub-Bidding
Longmont, CO 80503

Street Sweeper
Alteration
Post-Bid
Frisco, CO

Inclined Platform Lift
Alteration
Post-Bid
Craig, CO 81625

Walk Thru Metal Detectors (WTMD)
Results

Walk Thru Metal Detectors (WTMD)
Results

Westlake Park Irrigation System Construction
Infrastructure
Sub-Bidding
$387,000 CJ est. value
Grand Junction, CO 81501

Pueblo Water - Plastic Meter Lids Annual Contract 2022
Term Contract
Post-Bid
Pueblo, CO

Spanish Peaks SWA Solar Well Equipment and Installation
Infrastructure, Alteration
Results
Less than $40,000 est. value
Denver, CO

3-12 Jacketed Underground Cable
Term Contract
Sub-Bidding
Fort Collins, CO 80521

Pueblo Water - Supply of 8, 12 and 24 PVC or Ductile Iron Water Pipe
Term Contract
Post-Bid
Pueblo, CO 81003

Kitchen Equipment Replacement
Alteration
Results
Denver, Northglenn, Thornton, CO 80260

Compression Connector
Term Contract
Sub-Bidding
Fort Collins, CO 80521

Emulsion Dust Control Agent
Alteration
Post-Bid
Greeley, CO

N--Replace Chair Lift
Term Contract
Results
Littleton, CO 80123

Last Updated 08/14/2023 08:42 AM
Project Title

2024 Playground Equipment Replacements - Hillside Playground

Physical Address View project details and contacts
City, State (County) Arvada, CO 80003   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $168,999 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000327156 The City of Arvada is requesting proposals to design, furnish, and install playground equipment, fall zone material, and associated elements in connection with the 2024 Park Playground Equipment Replacement Project. Question Acceptance Deadline 08/15/2023 at 2:00 PM MT Questions are submitted online Yes General Requirements - Insurance Required Submit administrative questions NOT related to the project to: Doreen Mazza, dmazza@arvada.org Direct contact with the requesting department may result in vendor disqualification. BACKGROUND: The City of Arvada is requesting proposals to design, furnish, and install playground equipment, fall zone material, and associated elements in connection with the 2024 Park Playground Equipment Replacement Project. The project consists of design, procurement and installation of a new playground system, including demolition and removal of existing play structures and installation of new fall zone material and site furnishings at the existing Hillside Park playground in Arvada, Colorado listed below. Total dollar amount allocated to the project is $200,000, inclusive of demolition, disposal, procurement, freight, installation and all other contractual requirements, including Performance & Payment Bond, at this site. Further detail is described below and in Attachments A and B. Park Address (Arvada, CO) Existing Surfacing Suggested Budget Hillside Park 7400 Jay Ct

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents