Similar Projects
Seal Coating and Re-Striping of the Parking Lot at Arvest Ballpark
Infrastructure
Post-Bid
Springdale, AR 72762

Prairie Grove and Siloam Springs Overlay
Results
Prairie Grove, Siloam Springs, AR

Construction of 8th Street Widening SW I-Street to SE J-Street
Infrastructure
Post-Bid
Bentonville, AR

Highway 71B-12th-Tiger Intersection Improvements
Infrastructure
Post-Bid
Bentonville, AR

Oak Street and Uptown Overpass Improvements Project
Infrastructure
Results
$21,015,000 est. value
Rogers, AR

Administrative Services Building -1000 SW 14th Street
Infrastructure
Post-Bid
Bentonville, AR

2021 Street Overlay
Infrastructure
Results
Bentonville, AR

Asphalt Milling-Paving
Results
Rogers, AR

2021 Mastic Sealer for City of Bentonville Streets
Infrastructure
Results
Bentonville, AR

Design and Construction of Widening Greenhouse Road from Highway 12 to Highway 102
Infrastructure
Post-Bid
Bentonville, AR 72716

Mercy Way Corridor Improvements
Infrastructure
Results
Bella Vista, AR

Statewide CLRS Improvements
Infrastructure
Results

8th Street Widening - SW I-Street to SE J-Street
Infrastructure
Post-Bid
Bentonville, AR

South J.B. Hunt Drive Extension - Pauline Whitaker Parkway - Bellview Road
Infrastructure
Results
Rogers, AR

Hazelton Road Street Improvements
Infrastructure
Post-Bid
Pea Ridge, AR 72751

Last Updated 01/13/2022 03:56 PM
Project Title

Pike Avenue Bike and Pedestrian Improvements

Physical Address View project details and contacts
City, State (County) Little Flock, AR   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 to $475,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is the construction of approximately 3,072 linear feet of shared-use path, pedestrian signal, and other improvements along Hwy. 365 (Pike Avenue) in North Little Rock. The work involved includes, but is not limited to, 2,100 cubic yards of excavation, 440 ton of ACHM surface course, 1,250 cubic yards of aggregate base course, concrete sidewalk, crosswalk improvements, and pedestrian signal improvements as shown on the plans.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents