Similar Projects
John Day Dam Bearing Shoe Repair - Phase 2
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Goldendale, WA 98620

Cottonwood Island Pile Dike Repair
Renovation, Infrastructure
Post-Bid
Kelso, WA 98626

Mill Creek Diversion Dam Fish Ladder
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Walla Walla, WA 99362

Chief Joseph Dam Station Service Refurbishment - Turbines & Generators
Renovation
Post-Bid
$10,000,000 to $25,000,000 est. value
Bridgeport, WA 98813

Chief Joseph Dam, Upstream Spillway Monolith Sealing
Renovation
Design
Bridgeport, WA

Reservoir Cover Replacement
New Construction
Results
$2,000,000 est. value
Aberdeen, WA

Y--Fish Screen Replacement - Roza Diversion Dam
Term Contract
Post-Bid
Yakima, WA 98901

Y--Fish Screen Replacement - Roza Diversion Dam
Term Contract
Post-Bid
Yakima, WA 98901

Lower Monumental Navigation Lock Power and Controls Upgrade
Renovation
Design
$5,000,000 to $10,000,000 est. value
Kahlotus, WA 99335

Culmback Dam 48 Inch Cone Valve Replacement Project
Renovation
Results
WA

Furnishing and Installing Seismic Upgrades
New Construction
Results
$2,700,000 est. value
Lakewood, WA 98259

6MG1 Reservoir Recoating and Vent Replacement
Renovation
Results
$3,400,000 to $3,700,000 est. value
Kent, WA

LWSC Large Lock Center Gate Replacement
Renovation
Design
$10,000,000 to $25,000,000 est. value
Seattle, WA 98113

Mud Mountain Dam Lower Cascade Creek Water Control Facility
New Construction
Bidding
$5,000,000 to $10,000,000 est. value
Enumclaw, WA

Last Updated 04/29/2022 06:22 AM
Project Title

Tawanka Steam Utility Replacement

Physical Address View project details and contacts
City, State (County) Cheney, WA   (Spokane County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $61,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project is to replace the existing direct bury steam and condensate lines serving Tawanka. The work includes constructing a buried utility tunnel between the existing main tunnel and Tawanka to house the new steam and condensate piping. The new steam and condensate lines will tap into the existing services in the main tunnel, and enter the new utility tunnel through cored holes. Once in the building, the lines will be routed through the first-floor ceiling, and down to the existing steam converter station. Once the new lines are in, the existing steam and condensate lines will be disconnected at both ends, and will be removed or abandon in place as noted.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Division 40 - Process Integration, Steam Process Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents