Similar Projects
Clearwater Multimodal Transit Center
New Construction - 75,000 SF
Conception
$34,000,000 est. value
Clearwater, FL 33757

Demolish Flight Pen, Install New
Term Contract
Design
$100,000 to $250,000 est. value
Gainesville, FL

General Aviation Terminal and Airport Office Building Improvements
Renovation
Bidding
Naples, FL 34104

Escalators Modernization at Pensacola International Airport
Renovation
Bidding
Pensacola, FL 32504

Demolition Contractor
Demolition
Post-Bid
Davenport, FL

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Construction of Satellite Concourse "C" at VPS
Results
Eglin AFB, FL 32542

Concourse E Satellite - Structural Repairs
Results
Miami, FL 33159

MSC PortMiami
New Construction
Construction
$300,000,000 est. value
Miami, FL

Greyhound Terminal Construction Services
Renovation
Construction
$470,000 est. value
Orlando, FL 32805

Lilium Vertiports
New Construction
Pending Verification
Orlando, FL

Construction of the Baggage Handling System and Checked Baggage Inspection System
New Construction
Bidding
Sarasota, FL 34243

Prequalification for Annual Contract - Demolition
Demolition, Term Contract
Post-Bid
FL

Demolition of Four Townhome Properties - PQ-Demo
Results
Less than $60,000 est. value
Jacksonville, FL 32217

3307 Timberwood Road - Demolition
Demolition
Post-Bid
Lakeland, FL 33810

Last Updated 04/04/2022 07:37 AM
Project Title

Federal Inspection Station Renovation

Physical Address View project details and contacts
City, State (County) Sanford, FL   (Seminole County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition and renovation of approximately 60,000sf of existing terminal space. Work includes but is not limited to drywall, framing, electrical, low voltage, plumbing, concrete, steel framing, flooring, millwork, windows, and ceiling. Work will be performed with individual phases and allowance for a move in period before moving into the next phase. The facility will remain operational during construction and all CBP security requirements will be maintained for the duration of the project.

Details

Airline/Passenger Terminal, 60,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents