Similar Projects
Hot Patch 2022 - 2023
Term Contract
Bidding
Waterbury, CT

Cold Patch 2022 - 2023
Term Contract
Bidding
Waterbury, CT

Bituminous Surface Treatments, Crack Sealing, Hot In-Place Asphalt Recycling and Chip Sealing
Post-Bid
Naugatuck, CT

Hawley Road Reconstruction
Post-Bid
Oxford, CT 06478

Indefinite Quantity Construction Services for Road & Bridge Maintenance
Results
$1,000,000 est. value

Traffic Signal and Intersection Improvements
Results
Meriden, CT

Permanent Road Patching
Infrastructure
Bidding
$300,000 est. value
New Haven, CT

Crack Seal
Post-Bid
Milford, CT

Pavement Restoration and Sidewalk Ramp Replacements
Results
Cheshire, CT

Permanent Pavement Repair Program
Infrastructure
Bidding
$700,000 est. value
Madison, CT

Paving Services
Infrastructure
Post-Bid
Prospect, CT 06712

2021 Milling and Paving
Results
Waterbury, CT

West End Streetscape Improvements Phase IV
Infrastructure
Post-Bid
East Haven, CT

Exchange Place Street Revitalization Phase 1 East Main Street
Results
Waterbury, CT

Cedar Lake Dam and Roadway Improvements
Renovation, Infrastructure
Post-Bid
Wolcott, CT

Reported 05/13/2022 12:00 AM
Project Title

2022 Milling and Paving

Physical Address View project details and contacts
City, State (County) Waterbury, CT   (New Haven County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all of the labor, services, equipment, materials, supplies, transportation, and incidentals necessary to complete the Project as specified in this agreement (also referred to herein as "Contract") and such shall be completed in a satisfactory manner, as reasonably determined by the City. All labor, services, equipment, materials, supplies, transportation, and incidentals shall comply with (i) any and all applicable local, state and federal laws, statutes, ordinances, rules and regulations, including without limitation all notice requirements thereunder, and (ii) generally accepted professional standards. 1.1. The Project consists ofthe 2022 Milling & Paving ofvarious streets throughout the City of Waterbury and construction of ADA compliant concrete pedestrian ramps on various streets and line striping as detailed and described in Attachment A and are hereby made material provisions of this Contract. Attachment A shall consist of the following, which are attached hereto, are acknowledged by the Contractor as having been received, or otherwise hereby incorporated by reference as noted below, and all are made a part hereof

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents