Similar Projects
Fries Road Culvert No 1 Replacement Project
Bidding
Espy, PA 16424

Paperdale Road Culvert Project
Post-Bid
Stillwater, PA 17878

Multiple Road Culvert Replacements
Post-Bid
Benton, PA 17814

Butternut Lane Culvert Project
Results
Millville, PA 17846

Flood Restoration Projects
Results
Bloomsburg, PA 17815

2 Culvert Replacements and 1 Culvert Rehabilitation
Post-Bid
Benton, PA 17814

Paperdale Road Culvert
Results
Stillwater, PA 17878

Three Culvert Replacements
Post-Bid
Benton, PA 17814

Valley Road Culvert Replacement Project
Results
$50,000 to $70,000 est. value
Millville, PA 17846

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Culvert Replacements
Results
Catawissa, PA 17820

Mchenry Road Culvert Project
Results
Benton, PA 17814

Clyde Road Culvert Project
Results
Benton, PA 17814

SR 487 Over Tributary to Fishing Creek
Results
$500,000 to $999,999 est. value
PA

Last Updated 12/03/2020 09:20 AM
Project Title

Flood Restoration Projects

Physical Address View project details and contacts
City, State (County) Bloomsburg, PA 17815   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Flood Restoration Projects located in Fishing Creek, Sugarloaf, and North Centre Townships, and Stillwater Borough. The 7 individual contracts include, but are not limited to, furnishing all materials, equipment, supplies, and labor to stabilize stream banks using riprap, stacked rock, precast concrete blocks or any established method according to NRCS/DEP specifications. We will look at 7 sites in the following municipalities: Fishing Creek Township (3 sites), Sugarloaf Town- ship (2 sites), North Centre Township (1 site) and Still- water Borough (1 site).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents