Similar Projects
Aggregate and Anti-Skid
Term Contract
Bidding

Bridge and Highway Maintenance Materials
Term Contract
Bidding

Furnishing and Delivering of Bulk Pulverized 1/8 Granular Quicklime
Post-Bid
Lansdale, PA

2020 Highway Paving Materials
Post-Bid
Willow Grove, PA 19090

2020 Magnetite Furnish and Delivery
Term Contract
Results
PA

2020 Dense Soda Ash
Term Contract
Results
PA

Asphalt Materials
Bidding

2020 Ready Mix Concrete Bid
Post-Bid
Abington, PA 19001

Engineered Retaining Wall System
Results
Abington, PA 19001

Superpave Materials
Bidding
Abington, PA

Superpave Materials
Post-Bid
Abington, PA 19001

Supplying, Furnishing, and Delivering of Roadway Materials
Results
PA

Ready Mix Concrete
Bidding
Abington, PA

Bituminous Materials, Plant Mix
Post-Bid

Engineered Retaining Wall System Materials
Bidding
Abington, PA

Reported 03/03/2020 12:00 AM
Project Title

Road Material , Equipment Rental

Physical Address View project details and contacts
City, State (County) East Greenville, PA 18041   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Aggregate Approximately 200 tons PA #1 Aggregate Approximately 500 tons PA #1B Aggregate Approximately 500 tons PA #2A Aggregate Approximately 100 tons PA #2B Aggregate Approximately 100 tons PA #3 Aggregate Approximately 200 tons PA #3A Aggregate Approximately 200 tons PA #4 Aggregate Approximately 200 tons Gabion Aggregate Approximately 200 tons Anti-Skid material Asphalt Approximately 100 tons 2 PI Stockpile Patch Approximately 2000 tons Superpave Asphalt Mixture Design 9.5 mm, PG 64S-22, Wearing Course 0.3 to 3.0 million ESAL's, SRL M 1 ½ " Depth Approximately 1500 tons Superpave Asphalt Mixture Design 9.5 mm, PG 64E-22, Wearing Course 3.0 to 10.0 million ESAL's, SRL M 1 ½" Depth Approximately 250 tons Superpave Asphalt Mixture Design 25.0 mm, PG 64S-22, Binder Course 0.3 to 3.0 million ESAL's 3" Depth Approximately 500 tons Superpave Asphalt Mixture Design 19.0 mm, PG 64S-22, Wearing Course 0.3 to 3.0 million ESAL's, SRL M-2 ½" Depth  EQUIPMENT RENTAL Approximately 50 hours each - Bituminous paver w/operator, screed operator and two laborers ?? moving equipment to township Approximately 50 hours -Two (2) Vibratory Tandem Rollers w/10 ton minimum static w/operator Each - moving equipment to township Approximately 100 hours - Tri-Axel Dump Truck w/operator Approximately 20 hours - Skid Steer Milling Machine with milling head for milling of start, stop and driveway paving notches and sweeper with operator and two laborers - Each - moving equipment to township Approximately 50 hours - Additional laborers and flagmen NOTE: Bituminous paver w/operator, screed operator and two laborers, vibratory tandem rollers w/10 ton minimum static w/operator, skid steer milling machine with operator and two laborers, Tri-Axel Dump Truck w/ operator and additional laborers and flagmen will be awarded to single bidder. Approximately 24 hours - Milling machine with milling head / drum a minimum of 80" wide with operator and one laborer and clean-up / sweeping Each - moving equipment to township

Details

Division 32 - Exterior Improvements, Base Courses, Aggregate Base Courses, Aggregate Surfacing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents