Similar Projects
Chipotle Mexican Grill
New Construction, Demolition
Conception
Detroit, MI 48224

Silverleaf - Single Family Homes - Phase 1
New Construction
Conception
Okemos, MI 48864

Ellsworth Independent Senior Living
New Construction, Demolition - 168,130 SF
Design
Ann Arbor, MI 48108

Neland Avenue Church
Addition, Demolition
Design
Grand Rapids, MI 49507

General Residential Construction Contractor
Term Contract
Bidding
Detroit, MI

Construction at 2920 Baldwin
New Construction
Bidding
Detroit, MI 48214

Affordable Housing General Contractor
Renovation
Post-Bid
Flint, MI 48506

Housing and Commercial Rehabilitation Services
Term Contract
Post-Bid
Detroit, MI

CDBG Housing Rehabilitation: 19380 Washtenaw, Harper Woods
Results
Harper Woods, MI

Developer Qualifications 410 East Drive
Results
Marshall, MI

Pennridge Trail - Phase 1
New Construction - 104,000 SF
Construction
$10,000,000 CJ est. value
Portage, MI 49024

Fuhrmann Woods
New Construction
Construction
Sterling Heights, MI 48310

Mi Favorita Grocery Store - Parking Lot Expansion
New Construction, Demolition
Pending Verification
Holland, MI 49423

Maple Glen Development - Single Family Homes
New Construction
Pending Verification
Wixom, MI 48393

Schoenherr Road Warehouse - Speculative Building
New Construction, Demolition - 19,600 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Warren, MI 48089

Last Updated 02/25/2022 03:05 PM
Project Title

2022 Affordable Housing

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI   (Washtenaw County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Single-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents