Similar Projects
Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

City Parks Improvement
Infrastructure
Bidding
$200,000 CJ est. value
Southaven, MS 38671

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Water and Wastewater Supplies 2021-2022
Infrastructure
Post-Bid
Olive Branch, MS

DCS Accessible Playground Additions
Addition
Results
$242,482 est. value
Olive Branch, MS 38654

Hernando Hills Elementary School Addition
Addition - 68,875 SF
Results
$1,473,000 est. value
Hernando, MS 38632

The Cascades
New Construction, Infrastructure - 400,000 SF
Pending Verification
$385,000,000 CJ est. value
Olive Branch, MS 38654

Scannell Properties Industrial Development / Olive Branch
New Construction, Infrastructure - 488,000 SF
Pending Verification
$262,000,000 CJ est. value
Olive Branch, MS 38654

Self-Serve AV-Gas - Olive Branch Airport
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Olive Branch, MS 38654

Lewisburg School Sidewalk Project
Infrastructure
Results
$334,843 est. value
Hernando, MS 38632

Short Fork Farms
New Construction, Infrastructure
Pending Verification
$235,000,000 CJ est. value
Hernando, MS 38632

Quik Trip / Olive Branch
New Construction, Infrastructure - 8,292 SF
Post-Bid
$2,200,000 CJ est. value
Olive Branch, MS 38654

Abraham House of God
New Construction, Infrastructure
Results
$2,800,000 CJ est. value
Horn Lake, MS 38637

The Townhomes of The Preserve at Cedar Bluff
New Construction, Infrastructure
Pending Verification
$44,500,000 CJ est. value
Olive Branch, MS 38654

Last Updated 02/02/2023 10:49 PM
Project Title

Desoto Central Primary School Addition and Storm Shelter

Physical Address View project details and contacts
City, State (County) Southaven, MS 38672   (DeSoto County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,433,303 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing a new 11,500 SF 10 classroom attached school building addition at the existing Desoto Central Primary School Campus located at 3210 Getwell Rd, Southaven, MS 38672. Two of the ten classrooms will be designed to meet the storm shelter requirements of ICC 500. The new facilities will include all associated site work which includes grading, paving, drainage, utilities, and other related work as shown on the drawings and/or described in the specifications. Proposals shall be submitted on proposal forms provided with the specifications and must be accompanied by Proposal Security in the form of Certified Check or acceptable Bid Bond in the amount equal to at least five percent (5%) of the Base Bid: such security to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal, execute contract and post Performance Bond in the form and amount within the time specified. The Bid Bond, if used, shall be payable to the Owner. All bids submitted in excess of $50,000.00 by a Prime or Subcontractor to do any erection, building, construction, repair, maintenance, or related work must comply with the Mississippi Contractors Act of 1985, by securing a Certificate of Responsibility from the State Board of Contractors. Bids on the Project must be received on or before the period scheduled for the project and no bid withdrawn after the scheduled closing time for the project for a period of forty-five (45) days. The Owner reserves the right to reject any and all bids on any or all projects and to waive informalities

Details

11,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents