Similar Projects
Repair Main Gate
Term Contract
Design
Newington, NH

Cemetery Maintenance
Bidding
Lebanon, NH 03756

Dog Park Fencing
Post-Bid
Somersworth, NH

Transfer Station Gate Project
Post-Bid
Meredith, NH

Repair MEP Gate, Somersworth ARC, NH
Results
$25,000 to $100,000 est. value
Somersworth, NH 03878

Chain Link Fencing
Results
Boscawen, NH

Air Show Fencing
Term Contract
Post-Bid
Newington, NH 03801

Fence Installation-Broad Street Parkway Bridge
Results
Nashua, NH

Fencing Upgrades - Robbie Mills Sports Complex
Results
Laconia, NH

Water Treatment Facility Gate Replacement-Construction Services
Results
Keene, NH

Fence at Bouchard Well
Results
Dover, NH

2020 Goffstown Sports Field Fencing Project
Results
Goffstown, NH

Fence at Orchard Street
Results
Dover, NH

William Allen Elementary School Fence Installation
Results
Rochester, NH 03867

Fence at Watson Park
Results
Merrimack, NH

Last Updated 08/31/2021 09:19 AM
Project Title

Service Gate Replacement at Surry Mountain Lake Dam

Physical Address View project details and contacts
City, State (County) Surry, NH 03431   (Cheshire County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Surry Mountain Lake Dam, completed in 1942, is situated on the Upper Connecticut River. The gates were previously replaced in 2000 with a subsequent project in 2008 to tried to rectify gate balance and closing issues. The work associated with this project involves is for the design, fabrication, and installation of two new steel gates, and compatible seals at Surry Mountain Dam. This project consists of the following Scope: - Disassemble hoist operating equipment as needed to remove the existing gates from the wire ropes. - Fabricate two new Broome style gates per provided performance-based criteria and specifications, with adjustments for gate pocket specific tolerances and field verified dimensions. Plans and calculations will need to be submitted based on the performance-based specification for the gates to demonstrate compliance with performance criteria. - Remove and dispose of existing stainless-steel gates. - Install new gates and compatible side and bottom seals. Installation can be made in the upper gate tower. -Test seal and gate operations.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents