Similar Projects
Richfield City Sewer Lagoon Improvements and Sewer Collection Pipe Upgrades
Bidding
Richfield, UT

UDOT Hanksville MS4 Project
Term Contract
Bidding
Hanksville, UT 84734

Lehi City Lower School House Springs
Post-Bid
Lehi, UT 84043

500 West Sewer Improvements Project
Post-Bid
Vernal, UT

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

104th and Bangerter Relocation
Term Contract
Results
Less than $1,300,000 est. value
Bluffdale, UT 84065

Dooley Court
Bidding
$1,097,130 est. value
Salt Lake City, UT 84102

On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

Bench Lake Area Sewer Project
Results
$3,500,000 to $4,000,000 est. value
Hurricane, UT 84737

1800 North Sewer Realignment
Post-Bid
Salt Lake City, UT 84116

Installation and Repair of Sanitary Sewer Facilities
Results
Less than $125,000 est. value
Salt Lake City, UT

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Construction of the Tonaquint Sewer Project
Post-Bid
Saint George, UT 84770

Waste Pumping
Results
Provo, UT 84606

Last Updated 12/19/2019 02:40 PM
Project Title

Z--Sanitary Server Lining at Jones Hole National Fish

Physical Address View project details and contacts
City, State (County) Vernal, UT 84078   (Uintah County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Jones Hole National Fish Hatchery: Install sanitary sewer lining. Contractor shall provide all design, labor, and materials to rehabilitate existing sanitary sewer using UV cured CIPP technology and install CIPP sewer main/lateral connection seals. Perform all supporting preparatory, investigative and testing procedures including, but not limited to, implementation and maintenance of sewer bypass system, cleaning of sanitary sewer pipes, pre and post CCTV, pressure/vacuum testing. Rehabilitate manholes as needed based on contractor performed water tightness testing.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents