Similar Projects
Last Updated | 09/02/2022 12:33 PM |
Project Title | Simsboro Aquifer Water Supply Facilities - Bid Package 1 - Production Wells and Pumps |
Physical Address | View project details and contacts |
City, State (County) | Bastrop, TX 78602 (Bastrop County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $35,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Bastrop is in the process of converting its water supply source from shallow alluvial wells primarily fed by the Colorado River to deep wells that draw from the Simsboro Aquifer; which will provide the City with a reliable, resilient, drinking water supply. This package is for the well field production, as well as testing and disinfection of existing site well. The project consists of the following: A new well field and production facilities Three additional wells will be needed to meet Phase 1 flows, which consist of an average production capacity of 3 MGD and a peak capacity of 6 MGD. Groundwater treatment facilities Based on water quality sampling, a WTP primarily focusing on iron and manganese removal will be needed. It will consist of chemical addition facilities housed in a chemical building and gravity filters housed in a filter building. Once treated, water will flow to a 0.5 MG clearwell Ground Storage Tank (clearwell) 5 MG clearwell, Transmission pump station Transmission pumps will pull water from the clearwell and send it through the 24-inch diameter, 21,500 lf transmission pipeline to GSTs at the Willow Site. Transmission piping - Lift Station and Force Main A 21,500 lf wastewater forcemain will run along the same route as the transmission pipeline to convey wastewater generated during filter backwash and in the Filter Building to the City's wastewater collection system. Associated services Electrical and instrumentation Site development and access Various site improvements, paving, grading, fencing, landscaping. The project value listed reflects the total project estimate |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |