Similar Projects
John M. Price District Attorney Building - Replace Carpet Throughout Facility - P000176 - Sacramento County
Alteration
Conception
$868,000 est. value
Sacramento, CA 95814

Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Bakersfield High School Warren Hall Modernization Descope Phase 1
Renovation, Infrastructure
Sub-Bidding
$164,000 CJ est. value
Bakersfield, CA 93304

Presidio of Monterey - VCT Floor Tile Building #650
Renovation
Sub-Bidding
$500,000 CJ est. value
Monterey, CA 93944

Carpet Replacement
Alteration
Post-Bid
Bishop, CA 93514

Bny Mellon Club Engineered Wood Refinishing
Alteration
Post-Bid
Santa Clara, CA 95054

Oak Park Dance Floor Repair
Alteration
Results
$93,000 est. value
Santa Barbara, CA 93102

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

Roller Hockey Rink Floor Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Torrance, CA 90501

Flooring Repair and Installation Services
Alteration
Post-Bid
Roseville, CA

Flooring for Desert Housing
Term Contract
Results
CA

FEMA Region 9 Floor Core Services
Alteration
Post-Bid
Oakland, CA 94607

Gym Floor Refinishing
Term Contract, Alteration
Results
$100,000 est. value
Fremont, CA

Gym Lobby Flooring
Alteration
Post-Bid
San Bernardino, CA 92408

Flooring - Nichols and Foussat Elementary Schools
Alteration
Results
$200,000 est. value
Oceanside, CA 92057

Last Updated 06/20/2023 10:38 AM
Project Title

Flooring Replacement Projects - Phase 1 Bid Package #1 George Hall Elementary School Wings 1, 2, 3, and 4

Physical Address View project details and contacts
City, State (County) San Mateo, CA 94403   (San Mateo County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $210,624 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

To bid on this Project, the Bidder is required to have been prequalified by the District. To bid on this Project, the Bidder is required to have been prequalified by the District. Pre-qualification for all bidding General Contractors and Sub-Contractors is to be through Quality Bidders at website In addition, if the Project has flooring, electrical, mechanical, or plumbing components that will be performed by subcontractors performing under the following license classification (s), C-4, C-7, C-10, C-15, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46. then each of those subcontractors that intend to bid as a first-tier subcontractor to a general contractor (prime contractor) are required to have been prequalified by the District, through Quality Bidders at website Prior to the bid, a minimum of five days before bids are received the District will issue by Bid Addendum all SubContractors pre-qualified through Quality Bidders. All pre-qualification questionnaires will be received until 4:00 P.M., April 14th, 2023, through Quality Bidders using their web link at website - For this project you must COMPLETE THE PREQUALIFICATION APPLICATION - NOT THE CUPCCAA LIST. Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Any bid that is submitted after this time shall be non-responsive and returned to the bidder. 5. The project consists of the following scope of work as indicated: Bid Package #1 - SMFCSD Bid - George Hall ELEMENTARY SCHOOL As per specified locations and construction specifications provided by the District, the project consists of all labor, materials, equipment and services necessary to complete the following scope: Abatement of areas as required (See report - Scope description) Demo and remove the existing carpet, VCT/LVT and wall base Furnish and Install specified moisture barrier system and provide proper floor preparation for all existing concrete subfloor areas receiving new flooring Furnish and Install new specified entry walk off carpet tile, resilient plank flooring, resilient sheet flooring, top set coved wall base and all related sundries and accessories. All participants are required to sign upon arrival. The site visits are expected to last approximately two (2) hours. Failure to attend or tardiness will render the bid ineligible. Bidding contractors/subcontractors are required to attend only one (1) pre-bid conference of the three offered. The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. Request for Information (RFI's) and Bid period questions relative to the building projects are to be submitted to Billy Tran, SMFCSD Staff, btran@smfcsd.net

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents