Similar Projects
Berth 4 Grain Elevator/Silo Complex Demolition (Rebid)
Demolition, Infrastructure
Bidding
$6,000,000 CJ est. value
Longview, WA 98632

Don Armeni Boat Ramp Piling and Dock Replacement
Infrastructure
Bidding
$1,075,050 CJ est. value
Seattle, WA 98126

Courthouse Replumbing of Potable Water
Renovation
Sub-Bidding
$40,000 CJ est. value
Stevenson, WA 98648

FX Hydronic Pipe and Valve Replacements
Renovation
Sub-Bidding
$623,500 CJ est. value
Bellingham, WA 98225

Custom PVC Elbow Traps - Value Blanket
Alteration
Post-Bid
Spokane, WA

Ductile Iron Pipe
Alteration
Post-Bid
Everett, WA

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

URGENT Residential Plumbing Repair
Alteration
Results
Spanaway, WA

Hydroelectric Controls Upgrade Project
Renovation
Bidding
$1,099,000 CJ est. value
Walla Walla, WA 99362

CRC Mechanical Room Leak Mitigation
Renovation
Sub-Bidding
$40,000 CJ est. value
Olympia, WA 98505

Residential Plumbing South
Term Contract
Post-Bid
$4,000 est. value
WA

MHR - Urgent Residential Plumbing Repairs
Alteration
Results
$2,950 est. value
WA

Deer Park Municipal Airport Sanitary Sewer Extension
Infrastructure
Bidding
$200,000 CJ est. value
Deer Park, WA 99006

Residential Plumbing North
Term Contract
Post-Bid
$7,500 est. value
WA

Weatherization Residential Insulation 8550
Alteration
Results
Eatonville, WA

Last Updated 03/06/2023 02:02 AM
Project Title

South Side Water System Improvements - Phase II and S. 5th Avenue Reconstruction

Physical Address View project details and contacts
City, State (County) Connell, WA 99326   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $838,130 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Waterlines, Cement Subgrade, Water Utilities, Pavement - Marking, Aggregate, Construction, Jack and Bore / Sewer / Water Construction, Traffic Control, Grade and Surface, Excavation, Paving (Asphalt or Concrete) Removal of Structures and Obstructions Roadway Excavation, Incl. Haul Gravel Surface Restoration (6-In. Depth) HMA Cl. 1/2-In. PG 70-28 Asphalt for Fog Seal Portland Cement for Cement-Treated Base Crushed Surfacing Install Pipe for Water Main, 6-In. Diam. Install Pipe for Water Main, 10-In. Install Pipe for Water Main, 12-In. Install 12-In. D.I. Water Line in 36-In. Steel Casing Abandon Existing Water Lines Install Gate Valve, 6-In. Install Gate Valve, 8-In. Install Butterfly Valve, 12-In. Remove Existing Valve and Valve Box The City of Connell, Washington (herein called the "Owner"), invites bids for the construction of the South Side Water Systems Improvements - Phase II and S. 5th Avenue Reconstruction project. The work includes installation of approximately 1500 feet of 12-inch water line, 150 feet of 36-inch steel casing, 3800 Square Yards (SY) of cement treated base, 1300 tons of Hot Mix Asphalt, water valves, hydroseeding, 2700 SY of gravel surface restoration, and other associated work. City of Connell, 104 East Adams Street, Connell, Washington Anderson Perry & Associates, Inc., 1901 North Fir Street, La Grande, Oregon Est. Value Notes: 950,000 to 980,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents