Similar Projects
Z1DA--595-21-111 Replace Day Tanks Buildings 2/17 - Design Build
Term Contract
Design
$150,000 to $200,000 est. value
Lebanon, PA 17042

0.3 MG Water Storage Tank and 0.3 MG Water Storage Tank Rehabilitation
Infrastructure
Bidding
$850,000 est. value
Alexandria, PA

2021 Tank Cleaning and Painting
Infrastructure, Alteration
Bidding
Beaver, PA

Final Clarifier Rehabilitation
Post-Bid
Monaca, PA 15061

Hoover Water Storage Tank Replacement Project
Post-Bid
$950,000 est. value
Bedford, PA 15522

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Southern Operations and Maintenance Facilities Improvements
New Construction, Addition, Demolition - 118,144 SF
Construction
PA

Construction of the Tank Mixing Piping Project
Infrastructure
Bidding
Conemaugh, Johnstown, PA 15909

Construction of the Clear Shade Tank No. 2
New Construction
Post-Bid
Windber, PA

Bunker Hill Water Storage Tank
Results
Central City, PA 15926

Sanitary Sewer Holding Tank at Chadds Ford Elementary School
Infrastructure
Bidding
Chadds Ford, PA 19317

Elevated Water Storage Tank
Post-Bid
Dallastown, PA 17313

World-Wide Water Storage Tank Remediation
Term Contract
Results

Exterior Tank Painting
Post-Bid
Salisbury, PA

Last Updated 12/28/2021 02:36 PM
Project Title

Y1NE--529-14-101 Demolish Water Tower Design Build

Physical Address View project details and contacts
City, State (County) Meridian, PA 16001   (Butler County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be for the selection of a prime contractor (construction partnering with an architect/engineering firm) to provide design-build services necessary for completion of designs for Demolish Water Tower (a Design-Build project). The Design Build team shall provide all, labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here along with other specified tasks as further defined in a request for proposal (RFP) for renovation of Project 529-14-101 Demolish Water Tower Design Build . The project shall be designed and completed in accordance with VA Criteria, EPA requirements, VA Specifications (including and developed specifically to meet local requirements for the Butler 529-14-101 Demolish Water Tower Design Build. Under a previous contract in 2015 this project was designed to 100% completion. Since the completed design, resultant contract design and specification documents will require to be updated to design completion of the referenced project and used in perform construction.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents