Similar Projects
Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Bidding
$10,750,000 to $11,100,000 est. value
Houston, TX 77074

Construction of Hike and Bike Trails at Cypress Creek Greenway for Harris County Precinct 4
Infrastructure
Bidding
Houston, TX

CRWS Maintenance Parking Improvements
Post-Bid
Dallas, TX 75212

P32 Parking Lot
Post-Bid
Stephenville, TX

Renovation of the Johnson County Burleson Sub-Courthouse Parking Lot
Results
$250,000 est. value
Burleson, TX 76028

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

Reclamation and Resurfacing of Parking Lots at Irwin Park and Guy Berry Park
Infrastructure
Post-Bid
Balch Springs, TX 75180

RM 12/FM 2439 Intersection Improvements
Results
$472,267 est. value
San Marcos, TX 78666

Campus Sidewalks and Road Repairs
Infrastructure
Post-Bid
Gainesville, TX

City of Copperas Cove - The Narrows Sidewalks
Results
Less than $1,640,000 est. value
Temple, TX 76522

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Barbara Drive Drainage Phase 2
Results
Less than $5,852,000 est. value
San Antonio, TX 78200

Shadow Creek Ranch Sidewalk Extension Project
Infrastructure
Post-Bid
Pearland, TX

Construction of New Parking Lot at the Michael Talbott Service Center
Results
Less than $555,400 est. value
Houston, TX 77002

2017 Bond Program Pedestrian Mobility and Streets TOC Package 9
Results
$4,000,000 est. value
San Antonio, TX 78205

Last Updated 09/28/2021 10:24 AM
Project Title

Mall Walk Sidewalk Replacement at TSTC in Sweetwater

Physical Address View project details and contacts
City, State (County) Sweetwater, TX   (Nolan County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of the mall walk sidewalk located at the Sweetwater Campus.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents