Similar Projects
Klumpp Planned Unit Development
New Construction
Conception
Fairhope, AL 36532

Overland Townhomes
New Construction - 15,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fairhope, AL 36576

Skyline Village Townhomes
New Construction
Design
Fairhope, AL 36532

New Justice Center
New Construction, Infrastructure
Bidding
$5,500,000 CJ est. value
Bay Minette, AL 36507

Construction of Sewer Collection System Rehabilitation
Infrastructure
Bidding
$200,000 CJ est. value
Fairhope, AL 36532

Site Development and Construction of East Terminal Building at H.L. "Sonny" Callahan Airport
New Construction, Infrastructure
Post-Bid
Fairhope, AL 36532

Bon Secour Dredge Site Repairs
Infrastructure
Post-Bid
Bay Minette, AL

Clearing and Grubbing Future School Site
Results
AL

Career Tech Academy - (Site Package Only)
New Construction
Results
$4,763,000 est. value
Loxley, AL 36551

Baytown Townhome Community
New Construction
Pending Verification
Fairhope, AL 36532

Klump Pud
New Construction
Pending Verification
Fairhope, AL

Palmetto Ridge Townhomes
New Construction
Design
$6,000,000 est. value
Gulf Shores, AL 36542

Lynndale Court Paving Project
Infrastructure
Bidding
$300,000 CJ est. value
Foley, AL 36535

Arts Alley Downtown Transit Hub Project
Infrastructure, Renovation
Post-Bid
$1,687,711 CJ est. value
Fairhope, AL 36532

Site Preparation and Prescribed Burns
Infrastructure
Results
Gulf Shores, AL

Last Updated 07/26/2022 09:08 AM
Project Title

Oyster Bay Townhomes

Physical Address View project details and contacts
City, State (County) Gulf Shores, AL 36542   (Baldwin County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $14,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 26, 2022, site plans for this project have been approved. Subdivision plans are under review. A general contractor has been confirmed. Construction timeline has yet to be determined.

Details

Apartments, 40 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents