Reported | 09/10/2021 12:00 AM |
Project Title | Wastewater Treatment Plant Expansion to 0.5 MGD |
Physical Address | View project details and contacts |
City, State (County) | TX (Fort Bend County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $4,200,000 |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The wastewater treatment plant work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct Wastewater Treatment Plant Expansion to 0.5 MGD including but not limited to site work; effluent piping; underground piping; on-site force main; buried RAS and WAS piping, other buried piping and valves; crushed concrete IWTP pad; an elevated headworks structure; concrete sidewalks; equipment concrete pads; site grading; and all other miscellaneous items shown and not explicitly specified in the packaged wastewater treatment plant specification. The electrical scope of the site work shall include new electrical service, the service rack and blower rack, and all duct banks, conduit and wire up to the proposed local control panels including all aboveground conduits and wire to pads; diesel generator and automatic transfer switch; pull boxes; bollards; all associated electrical and site work; facility start up in its entirety and all else specified and shown in the construction documents and not specifically addressed in the packaged wastewater treatment plant specification , complete in place for a fully functioning plant. The local control panels and all downstream duct banks, conduit and wiring will be provided and installed by the packaged wastewater treatment plant vendor. The construction of the 300,000 gallon per day package wastewater treatment plant shall include delivery and assembly of the plant with all accessories and equipment; the aeration basins; first and second stage digester units; final clarifiers; a chlorine contact basin; chlorination equipment; dechlorination equipment; eyewash and safety shower; walkways, bridges, and handrails; air diffusion equipment; plant lighting; three blowers; a sludge pump; control panels for equipment including the blowers, sludge pump, lighting, and all other electrical plant devices; interconnecting piping, valves and electrical wiring (including wiring to the service rack); and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the plant is all the plant related functions from the influent flange at the proposed Aeration Basins to the first fitting downstream of the dechlorination manhole. The packaged wastewater treatment plant installation shall be the responsibility of the packaged wastewater treatment plant vendor. Installation includes all delivery, install and start-up. The site work contractor shall coordinate with the plant vendor for all connections and slab |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |