Similar Projects
West Annex Building Bio-Safety Improvements
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Albany, CA 94710

City Hall Mechanical Replacement Project Phase II
Term Contract
Bidding
$5,895,000 est. value
San Francisco, CA

North Bay Regional Water Treatment Plant Chiller Replacement for O-Zone Generator
Alteration
Bidding
Fairfield, CA 94533

Sources Sought for Mechanical Repairs in CA RO
Term Contract
Post-Bid
Richmond, CA

Boiler Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

EMS Upgrades at the Main Library
Alteration
Results
$347,500 est. value
Burlingame, CA 94010

Port of Oakland Remote Operations Upgrades
Alteration
Bidding
Oakland, CA 94607

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Gate Opener Replacement Project for Police District Substations 1 and 2
Alteration
Results
$32,000 est. value
Visalia, CA 93291

Boiler Removal and Replacement at Chabot College Project
Alteration
Bidding
Hayward, CA 94545

Job Order Contract - Mechanical
Alteration
Post-Bid
Clovis, CA

SJC On-Call Mechanical Contract 21-22
Alteration
Results
$1,000,000 est. value
San Jose, CA 95110

Building 200 Boiler Replacement
Alteration
Bidding
Fresno, CA 93710

44--Option - Boiler Inspection
Term Contract
Post-Bid
Petaluma, CA 94952

Reported 04/06/2022 12:00 AM
Project Title

Temporary Portable Chiller System Rental Services

Physical Address View project details and contacts
City, State (County) Calipatria, CA 92233   (Imperial County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $5,040,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall supply, deliver, install, startup, and decommission four (4) portable 1,000-ton chiller systems (PCS). Each PCS shall consist of (at minimum and/or equal to) 1,000-ton chiller, 10” flex hoses and electrical cables, 1,000-ton cooling tower, water pump and associated chemicals. The PCS shall include all associated equipment to generate cooling for the California Department of Corrections and Rehabilitation (CDCR), Calipatria State Prison (CAL), located at 7018 Blair Road, Calipatria, CA 92233. The DVBE Goal is 3 Percentage.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents