Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Filter Media at Well #10
Renovation
Results
Frankfort, IL 60423

Gould Street Water Main Replacement
Infrastructure
Results
$1,100,000 est. value
Beecher, IL 60401

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

RR-21-4583R Weigh-In-Motion Replacement
Infrastructure
Results
Homer Glen, IL 60491

House of Harvest
New Construction, Infrastructure - 3,500 SF
Post-Bid
$934,500 CJ est. value
Plainfield, IL 60544

Construction Installation of Temp. Soldier
Infrastructure
Results
Joliet, IL

2022 Road Program - Heggs Road
Infrastructure
Post-Bid
Plainfield, IL 60585

Water Main Replacement Project 2
Infrastructure
Results
New Lenox, IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Laraway Road Water Tower Reconditioning 2022
Infrastructure
Results
$1,765,712 est. value
Joliet, IL

Parking Lot Crack Fill, Sealing, Striping & Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Channahon, IL 60410

Last Updated 07/24/2023 01:14 PM
Project Title

Interchange Reconstruction of I-55

Physical Address View project details and contacts
City, State (County) Joliet, IL 60431   (Will County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $59,259,179 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(2.5-Mile) Interchange reconstruction of I-55 from I-80 to US 52 ; adding auxiliary lanes on I-55 ; intersection improvement; new traffic signals; retaining and noise abatement walls; drainage improvement; shared- use path; roadway lighting; ITS; and aesthetic landscaping located in Joliet and Shorewood. Region 1 District 1 Federal Project # N/A County(s) Will Key Route(s) FAI 55 Marked Route(s) I-55 Section(s) 2018-075-R State Job #(s) C-91-208-19 PPS #(s) 1-79967-0000 1-79967-0005 1-79967-0006 1-79967-0010 1-79967-1000 1-79967-2010 VBP% 0.00 Completion Date: October 31, 2024 Plus 10 Working Days Questions not accepted as of June 07, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 232 - Interchange Reconstruction of I-55

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents