Similar Projects
Other Intersection Improvement
Alteration
Conception
$585,000 est. value
Goshen, IN 46528

Rehabilitate Runway - City of Elkhart
Infrastructure
Design
$250,000 est. value
Elkhart, IN 46514

Rehabilitate Runway - City of Elkhart
Infrastructure
Design
$250,000 est. value
Elkhart, IN 46514

2022-1 Community Crossings Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Bristol, IN 46507

2022-1 Community Crossings Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Bristol, IN 46507

Demolition of 110 North Brown Street
Demolition, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Middlebury, IN 46540

2021 Asphalt Paving – Phase 1
Infrastructure
Post-Bid
Middlebury, IN

2021 Crack Seal Roadway Maintenance
Infrastructure
Post-Bid
Nappanee, IN

CCMG Paving Program
Results
Goshen, IN

River District Drive and River Walks
Results
Less than $1,543,040 est. value
Elkhart, IN

2022-1 Community Crossings Resurfacing Project
Infrastructure
Bidding
$150,000 CJ est. value
Millersburg, IN 46543

2021 Microsurface Roadway Maintenance
Infrastructure
Post-Bid
Nappanee, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

County Road 17
Infrastructure
Post-Bid
Elkhart, IN

Studebaker Park Asphalt Path
Results
Elkhart, IN 46516

Last Updated 08/15/2022 12:32 AM
Project Title

Riverside/Rosedale High Rise Parking Lot Pavement Replacement

Physical Address View project details and contacts
City, State (County) Elkhart, IN 46516   (Elkhart County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall be performed as per Plans and Specifications prepared by Forum Architects, LLC. Work includes milling down of surface course asphalt pavement and surface/base course asphalt pavement (at designated areas) at parking lots and access drives, cleaning, prepping for installation of new surface course asphalt and new surface/base asphalt pavement (at designated areas) and re-striping of parking stalls. Additional work may include cleaning debris, etc. from ten (10) existing parking catch basins at Riverside High Rise and additional ADA stripping at Riverside/Rosedale High Rises. Proposals shall be properly and completely executed on the forms provided in these Specifications. Each Proposal also shall be accompanied by an acceptable certified check or cashier's check made payable to the order of the Housing Authority of the City of Elkhart, Indiana, or acceptable Bidder's Bond for an amount of not less than 5% of the amount of the Proposals, which check, or Bond shall be forfeited in case of failure of any Bidder to enter into the contract price, after notification of the acceptance of his Proposal. All Bids must be accompanied by a signed copy of the "Statement of Bidder's Qualifications/Affirmative Action in the form set forth in the Specifications. All prime Contractors submitting Bids on the Project shall encourage qualified minority subcontractors to perform any portion of the Work in the Project which is not performed by the Contractor's own forces. All bidders shall comply with HUD Section 3 Clause of regulation 24 C.F.R. part 135, with preference given to Certified Section 3 Bidders as outlined in the Project Specifications. Bidders must submit written evidence that quotations have been solicited from qualified Section 3 minority subcontractors at the time Bidder submits its Bid to the Housing Authority of the City of Elkhart, Indiana, for all portions of the Work in the Project which the Bidder is not proposing to perform with its own forces. Two conditions are complied with: 3. MACIAF 3215-A Sugar Maple Court 1. The return of Drawings and Specifications within ten (10) days after the date of receiving Bids and 2. The Drawings and Specifications are in usable condition as determined by the Architect. Should any Bidder fail in the observance of EITHER CONDITION he shall forfeit the FULL AMOUNT of his deposit. Said Housing Authority of the City of Elkhart, Indiana is not obligated to accept the lowest or any other Bid submitted and reserves the right to reject any and all Proposals, to waive informalities in any Proposal if it shall be in the judgment of the Housing Authority of the City of Elkhart so to do and to defer the acceptance or rejection until the financial arrangements for said Project are completed. Contractors awarded work shall furnish an acceptable Performance Bond and Payment Bond, in an amount equal to 100% of the Contract Price which form Contract and Bond shall conform to the forms prescribed by the State Board of Accounts The number of calendar days to complete the parking lot pavement replacement at Riverside and Rosedale High Rises shall be forty-five (45) calendar

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents