Similar Projects
Green Township Slip Repair Project
Bidding
Green, OH

Sand Run Tributary Slope and Channel Stabilization
Bidding
Akron, OH

Precast Concrete Headwalls
Post-Bid

Eckert Ditch Restoration
Post-Bid
Less than $375,430 est. value
Akron, OH 44308

Jacking and Boring Services
Term Contract
Results
Akron, Ashland, Bowling Green, Chillicothe, Delaware, Garfield Heights, Jacksontown, Lebanon, Lima, Marietta, New Philadelphia, OH

Box Culverts
Results

Jacking and Boring Services
Post-Bid

Concrete Pipes
Results

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Post-Bid

Slide Repair - IR 271-08.80 Slide
Results
OH

Cleveland-Massillon Road Culverts Phase II
Results
Less than $218,085 est. value
Clinton, OH 44216

Ellsworth Meadows Golf Course Drainage Installation
Results
Hudson, OH 44236

Site Drainage Improvements and Related Work
Results
Twinsburg, OH 44087

Summit County Culvert Replacement and Maintenance Program
Results
Less than $317,000 est. value
Akron, OH 44308

Sand Run Parkway/Jogging Trail and Channel Improvements - Culvert 41
Results
Akron, OH 44313

Last Updated 04/07/2021 04:55 PM
Project Title

Waterloo Road Brewster Creek Culvert Replacement

Physical Address View project details and contacts
City, State (County) Akron, OH   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,476,491
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing the two existing elliptical pipes under Waterloo Road with a Conspan type concrete culvert/tunnel. The two pipes on the private property to the south will be removed as part of the project. Project will include replacement of concrete curb, concrete sidewalk, utility relocation/repairs (water main, sanitary sewer, storm sewer, gas main and electric/communications), asphalt pavement, concrete pavement, drive aprons and creek realignment.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents