Similar Projects
NW PA ERG Concrete Vaults
Alteration
Bidding
Franklin, PA

Fire Station Concrete Apron Replacement
Alteration
Bidding
$50,000 to $70,000 est. value
New Cumberland, PA

Cement Concrete
Post-Bid
Washington, PA 15301

Concrete
Post-Bid
Palmer, PA 18043

Pouring and Finishing of a 50 X 100 Concrete Floor Slab at their Maintenance Facility
Results
Millsboro, PA 15333

Construction of a New Warehouse - Concrete Construction
Results
North East, PA 16428

Installation of a New Concrete Apron
Alteration
Bidding
Johnstown, PA 15906

Target #T1216 and T2787
Post-Bid
Pittsburgh, Washington, PA

2020 Concrete Program
Results
Spring House, PA 19477

2021 Shotcrete
Alteration
Bidding
PA

Ready Mix Concrete
Term Contract
Post-Bid
Pittsburgh, PA 15123

Concrete Services Contract
Term Contract
Results
$25,000 est. value
Bethlehem, PA 18017

Concrete Pavers
Alteration
Bidding
Philadelphia, PA

Portland Concrete
Post-Bid
Chambersburg, PA 17201

Riverfront Commons Concrete and Stone Repairs
Results
Wilkes-Barre, PA 18711

Last Updated 07/13/2021 07:34 AM
Project Title

Precast Concrete

Physical Address View project details and contacts
City, State (County) Allentown, PA 18102   (Lehigh County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Includes Product component engineering, anchor bolt drawing, shop drawings, P.E. calculations & final P.E. stamped shop drawings. Also includes all fabrication piece detail drawings, for internal use only. 2. Precast Parking Garage Structure 3. Standard structural grey concrete mix design with as cast finish, unless specifically noted otherwise within this bid proposal. 4. Architectural mix design similar to PCI plate # 227 Buff color with local sand & stone. Finish on exposed to view exterior surfaces to be a medium sandblast finish. The backside to be ST-1 (steel trowel finish, one pass; Finish on vertical form returns to be form finish. 5. Thin Brick approximately 9,500 SF. The brick locations were not settled at the time of this proposal nor has the actual brick color been selected. 6. Reveals: per plan 7. Chamfers are Standard ¾” as shown 8. Double Tee Sizes 16’ wide required / 7.5 stems spacing & 12-foot-wide / 6’ stem spacing. Both utilize a 4” flange & 30” deep section 9. Double Tee Finish is Straight Broom finish at any pre-topped tee surface areas. 10. Concrete Reinforcement are standard plain steel reinforcement in all cast concrete products, unless specifically noted otherwise within this bid proposal. 11. Corrosion Inhibitor includes CNCI 2 gal/CY of concrete in horizontal components only. 12. Elevator shafts designed with minimal obstructions for clear-view elevator design 13. Precast stair systems with integral anti-slip nosings (aluminum extruded) 14. South wall of precast along Walnut Street to be solid along property line 15. Successful bidder is required to mobilize for erection starting September 4, 2021 with completion by February 14, 2022 to comply with PA Game Commission restrictions.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents