Similar Projects
Boothbay Elementary and High Schools Renovation
Renovation
Conception
Boothbay Harbor, ME

Pond Cove Elementary & Cape Elizabeth Middle School
New Construction
Conception
Cape Elizabeth, ME

Driveway Repairs at the Caribou High School Campus
Infrastructure
Design
$290,000 est. value
Caribou, ME 04736

York School Department ADA Upgrades
Renovation
Post-Bid
York, ME

Dedham School Bathroom Renovations
Renovation
Post-Bid
Dedham, ME 04429

Edward Little High School Project
New Construction - 280,000 SF
Results
Less than $99,500,000 est. value
Auburn, ME

South Portland Middle School
New Construction - 176,000 SF
Results
Less than $54,360,000 est. value
South Portland, ME

Request for Qualifications - Easton School Department HVAC Renovation
Alteration
Post-Bid
Easton, ME

Edward Little High School Project - Filed Sub Bids
New Construction
Results
$99,500,000 est. value
Auburn, ME 04210

Abraham Lincoln School - Indoor Air Quality Improvements
Renovation - 36,000 SF
Post-Bid
$300,000 CJ est. value
Bangor, ME 04401

South Portland Middle School - Filed Sub Bids
New Construction - 176,000 SF
Results
Less than $54,360,000 est. value
South Portland, ME

Snowplowing and Sanding
Term Contract
Post-Bid
Dyer Brook, ME 04747

ADA Renovations - Biddeford Primary School
Renovation
Results
Biddeford, ME

Post Lift
Term Contract
Post-Bid
Augusta, ME 04330

Fairview School Bathroom Renovations and Washburn School Re-Roof Project
Renovation, Alteration
Results
Auburn, ME

Last Updated 08/08/2022 04:32 PM
Project Title

York Middle School and York High School Mechanical Upgrades

Physical Address View project details and contacts
City, State (County) York, ME 03909   (York County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $423,138 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General contract proposals must be accompanied by a certified or cashier's check for 5% of the proposal or a satisfactory bid bond (2-C1) in a similar amount. The owner reserves the right to waive all formalities, and reject any and all proposals or to accept any proposal. Proposals shall be submitted upon the form provided by the architect. The selected general contractor will be required to furnish a 100% contract performance bond and a 100% contract payment bond to cover the execution of the work which shall be in conformity with the form of bonds contained in section 2-C of the specifications and for the contract amount.

Details

Division 02 - Existing Conditions, Physical Decontamination, Mechanical Filtration Decontamination.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents