Similar Projects
Last Updated | 06/17/2021 03:46 PM |
Project Title | HMGP Lift Station 303 Hardening Project |
Physical Address | View project details and contacts |
City, State (County) | Green Cove Springs, FL (Clay County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | -Removal of Existing Generator- Delivered to 900 Gum Street, GCS Fl,32043 -Installation of New Generator/Attached Fuel Tank on Existing Pad- Retrieved from 900 Gum Street, GCS Fl, 32043 -Installation of Conduit for Generator -Installation of wire for Generator (wire size to be determined by contractor) -Installation of Transfer Switch -Retrieved from 900 Gum Street, GCS Fl 32043 -ALL Electrical Connections for Generator and Transfer Switch -Installation of 24-inch WETWELL Extension and Hatch -Raise the “Tree” to an appropriate Level and attach to newly installed 24-inch extension -Adjust wires for appurtenances to new height of “Tree” -Raise Existing Control Panel and appurtenances 24-inches -Obtain all Necessary Permits -Contractor is responsible for all applicable permit and inspection fees. -Build Aluminum Racks as Needed for Panel Boxes -Stainless Steel Chains Installed to Remove Pumps for Maintenance/Replacement |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |