Similar Projects
South Phase - Gantzel Road Phase Ii Extension:Combs To Queen Creek Wash - Cp0518 - City Of Mesa
Alteration
Conception
$1,179,899 est. value
Mesa, AZ 85201

McKellips Road Natural Gas Line: Country Club to Loop 202 - CP0221 - City of Mesa
Infrastructure
Conception
Mesa, AZ 85205

Dysart Road Sewer Replacement - Riley to Corral - U0045 - City of Avondale
Infrastructure
Design
$3,435,000 est. value
Avondale, AZ 85392

Dysart Road Sewer Replacement - Riley to Corral - U0045 - City of Avondale
Infrastructure
Design
$3,435,000 est. value
Avondale, AZ 85392

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

Destination at Gateway (Berge) Offsite Paving and Waterline Williams Field Road
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
Mesa, AZ 85212

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Mandarina Off-Site Water & Sewer
Infrastructure
Construction
Marana, AZ

Germann Road Waterline
Alteration
Construction
Queen Creek, AZ 85142

Mission Park Improvements - CIPPK22016 - City of Glendale
Renovation, Infrastructure
Conception
$653,093 est. value
Glendale, AZ 85302

Pressure Reducing Valve Rehabilitation
Infrastructure
Bidding
$315,000 est. value
Bullhead City, AZ

Festival Ranch Planning Area 2 Infrastructure Effluent Line
Post-Bid
Sun City, AZ

Last Updated 07/18/2022 02:46 PM
Project Title

Airway Avenue Drainage Improvements - City of Kingman

Physical Address View project details and contacts
City, State (County) Kingman, AZ 86409   (Mohave County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $2,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Kingman, Arizona. Conceptual plans call for site work for a water / sewer project. This project will improve Airway Avenue east of Prospector Street and improve the existing drainage channels from Diamond Joe Road north to the school. An infiltration / detention basin south of Airway is proposed as part of the design. As of July 15, 2022, this project is currently in the FY 2022-2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents