Similar Projects
Last Updated | 07/22/2020 08:56 AM |
Project Title | Windermere Pump Station Variable Frequency Drive Replacement |
Physical Address | View project details and contacts |
City, State (County) | Toledo, OH 43611 (Lucas County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal and of existing Pump 2 and Pump 3 VFDs and associated miscellaneous 480 volt feeder wiring from the Pump 2 and Pump 3 distribution circuit breakers. 3. Provision and installation of new 480 volt VFDs for Pump 2 and Pump 3 in same location as old units. Route new 480 volt supply conduit/wire from existing 480 VAC distribution circuit breakers to new VFDs. Coordinate with VFD supplier to provide cut-outs in enclosures to accommodate required conduit entries. Contractor is required to verify all field dimensions. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |