Similar Projects
Interior and Exterior Painting Services - Floor Covering Services - Refrigeration Service
Post-Bid
Waco, TX 76700

City Painting Services
Term Contract
Post-Bid
Denton, TX 76209

Repairing & Painting the Interior and Exterior Surfaces of a 55,000 Gallon Elevated Steel Storage Tank
Results
Charlotte, TX

Exterior Paint Project
Results
$100,000 to $250,000 est. value
San Angelo, TX 76908

Rehabilitation and Recoating of One Ground Storage Tank
Post-Bid
TX

2019 Elevated Tank Painting Improvements
Results
$559,000 est. value
Greenville, TX 75402

South Shore Harbor Booster Pump Station Recoating
Post-Bid
Less than $750,000 est. value
League City, TX 77573

Medical Elevated Storage Tank Overcoat Project
Results
Less than $609,000 est. value
San Antonio, TX 78229

Resurfacing, Painting, and Leak Repairs at the Splash
Post-Bid
Sherman, TX 75092

Preston Elevated Tank Painting and Site Improvements
Results
$1,492,000 est. value
Plano, TX

Exterior Painting on 11 Properties
Post-Bid
Bonham, TX 75418

Surface Preparation and Application of Belzona 5831 EM Valve Rehabilitation Project
Results
Fort Worth, TX 76135

BPO for Facility Painting
Post-Bid
Dallas, TX 75226

Painting, Drywall and Related Services - Facility Maintenance Contract
Term Contract
Results
Less than $120,000 est. value
Round Rock, TX 78681

Interior Painting
Post-Bid
Pittsburg, TX 75686

Reported 01/11/2020 12:00 AM
Project Title

Paint Adol 1st Floor

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78223   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Fix 125 patches on the first (1st) floor of the Adolescent’s Building. Patching includes scraping, repairing of patches, texturing, caulking of all cracks. 2. Prime and Paint all doors and door casings. 3. Enclose 1' x 4' openings on the top of walls in rooms 132-A,132-B,159-A, and 159-B. 4. Caulk and Paint Forty-two (42) windows. Windows will be marked by facility. 5. Sand, prime and paint both sides of Fifty-four (54) doors in Building 509. 6. Paint all marked ceilings and walls. Ceilings and walls will be marked by facility 7. Remove and replace ceiling tiles in rooms 101S, 102,103,104,123,124,149, and 150 with 2'X4' Fissure ceiling.tile.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents