Similar Projects
Upgrade Access Control System
Renovation
Sub-Bidding
$250,000 CJ est. value
Jackson, MS 39216

Entrance Modifications to Madison Station Elementary School
Renovation
Sub-Bidding
$200,000 CJ est. value
Madison, MS 39110

Intercom Upgrades - District Wide
Alteration
Post-Bid
$80,000 est. value
Quitman, MS

Badge Access and Camera Maintenance
Term Contract
Post-Bid
Jackson, MS 39201

Security Camera System
Alteration
Results
Starkville, MS 39760

Install Security Fencing
Term Contract
Results
Mississippi State, MS 39762

Intercom System
Alteration
Post-Bid
$60,000 est. value
Wiggins, MS

Tate County School District Security Upgrades
Alteration
Results
$250,000 est. value
Senatobia, MS

Access Control Door Hardware and Electronics
Alteration
Post-Bid
Mississippi State, MS

Access and Hardware Upgrades
Renovation
Results
$200,000 CJ est. value
Carriere, MS 39426

BSD 2022 Security Cameras
Alteration
Post-Bid
Booneville, MS

2023 Access Control
Renovation
Results
$222,887 CJ est. value
Hattiesburg, MS 39401

Classroom Modifications - Technology Equipment
Alteration
Post-Bid
University, MS

Olive Branch Middle School Surveillance System Upgrades
Renovation
Results
$132,820 CJ est. value
Olive Branch, MS 38654

College Monitoring and Surveillance System Addition and Upgrade
Alteration
Post-Bid
$200,000 est. value
Raymond, MS 39154

Last Updated 10/07/2023 02:31 AM
Project Title

P25 Radio System Upgrade

Physical Address View project details and contacts
City, State (County) Gulfport, MS 39501   (Harrison County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Due to a USB and hard copies being required, we will be unable to accept "Electronic Proposals" submitted on-line at www.centralbidding.com. The Board reserves the right to accept or reject any or all proposals, or any part of any or all proposals based on a best proposal determination. If the proposal documents request separate proposals on phases, or items of a project, the Board reserves the right to accept or reject any or all proposals or any part of any or all proposals based on a best proposal determination on each phase or item for which a separate proposal is requested. The Board reserves the right to reject any and all proposals and to waive informalities. If the agency is closed for any reason, including but not limited to: acts of God, strikes, lockouts, riots, acts of war, epidemics, governmental regulations superimposed after the fact, fire, earthquakes, floods, or other natural disasters (the "Force Majeure Events"), which closure prevents the opening of proposals at the advertised date and time, all proposals received shall be publicly opened and read aloud on the next business day that the agency shall be open and at the previously advertised time. The new date and time of the proposal opening, as determined in accordance with this paragraph, shall not be advertised, and all Vendors/Contractors, upon submission of a proposal, shall be deemed to have knowledge of and shall have agreed to the provisions of this paragraph. Proposals shall be received by the agency until the new date and time of the proposal opening as set forth herein. The agency shall not be held responsible for the receipt of any proposals for which the delivery was attempted and failed due to the closure of the agency as a result of a Force Majeure Event. Each Vendor/Contractor shall be required to ensure the delivery and receipt of its proposal by the agency prior to the new date and time of the proposal opening. The Board reserves the right to accept or reject any or all proposals, or any part of any or all proposals based on a best proposal determination. If the proposal documents request separate proposals on phases, or items of a project, the Board reserves the right to accept or reject any or all proposals or any part of any or all proposals based on a best proposal determination on each phase or item for which a separate proposal is requested. The Board reserves the right to reject any and all proposals and to waive informalities. Proposals may be held by the Owner for a period not to exceed sixty (60) days from the date of submittal for the purpose of reviewing the proposals and investigating the qualifications of vendors/contractors, prior to awarding of the Contract.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents