Similar Projects
Pierson Drain Improvements Phase I
Infrastructure
Bidding
Fort Wayne, IN

2021 Helen P. Brown Natatorium Bulkhead Replacement
Post-Bid
Fort Wayne, IN 46806

Ladig No. 2 Drain Reconstruction
Infrastructure
Post-Bid
Fort Wayne, IN

Northway Drive and Southway Drive Culvert Replacement
Results
Fort Wayne, IN 46800

North Washington Road Drainage Improvements
Results
Fort Wayne, IN 46800

Quantity Purchase Award (QPA) Agreement for High Density Polyethylene and Profile Wall PVC Pipe Liner
Term Contract
Post-Bid

Diane Drive Drainage Improvements and Water Main Replacement
Results
Fort Wayne, IN 46800

Aluminum Box Culverts
Term Contract
Post-Bid
Fort Wayne, IN

Small Structure Pipe Lining
Results
IN

Various Types of Corrugated Metal and Plastic Pipe for the Year 2022
Term Contract
Post-Bid
IN

Franke Park Drainage Improvements
Results
Fort Wayne, IN 46808

Heather Ridge and Aboite Center Road Drainage Improvements
Infrastructure
Post-Bid
Fort Wayne, IN 46895

HDPE Pressure Utility Piping
Results
Fort Wayne, IN

Oaks Tile Repair
Infrastructure
Results
Fort Wayne, IN

Prairie Meadows Tile Repair
Infrastructure
Results
Fort Wayne, IN

Last Updated 02/22/2022 10:33 AM
Project Title

Shank Tile Drain

Physical Address View project details and contacts
City, State (County) IN   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall install approximately 1770 ± lineal feet (LF) of new 15" HDPE Dual Wall pipe, 4 new 33" Inlet structures, 20 + lineal feet (LF) of new 12" HDPE Dual Wall pipe, 44 ± lineal feet (LF) of new 15" Class III Reinforced Concrete Pipe (RCP) across WOODS RD, and install 4 new 48" manhole structures as shown in the Surveyor's construction plans. The contractor shall connect any private lateral pipe encountered on installation of new pipes with HDPE corrugated single wall pipe of the corresponding size. The Contractor shall use pipe laser and laser level while installing pipe and structures to conform to Surveyor's construction plan grades and inverts. Project also requires 5220 ± square yards of restoration. More details are available in the contract documents. Option 1: Install additional 60 L.F. of 12" HDPE Dual Wall pipe and 2- 30" inlet structures.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents