Similar Projects
Upton Elementary / Middle School boiler Heating Hot Water System Replacement Project
Renovation
Sub-Bidding
$300,000 CJ est. value
Upton, WY 82730

Moyer Building Medium Density Fibreboard (MDF) Cooling Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Powell, WY 82435

Heating Upgrades
Alteration
Post-Bid
Jackson, WY 83001

Coroners Office HVAC Upgrades
Alteration
Post-Bid
Jackson, WY 83001

Story Elementary HVAC Upgrade
Alteration
Results
$100,000 est. value
Story, WY 82832

Purchase and Installation of Boiler for County Courthouse Snowmelt System
Renovation
Results
$117,343 CJ est. value
Laramie, WY 82070

Chiller Removal and Replacement
Renovation
Sub-Bidding
$80,000 CJ est. value
Cheyenne, WY 82001

H941--Airflow Test and Balance (Tab) and HVAC Controller Services
Term Contract
Post-Bid
Loveland, CO - Cheyenne, WY 82001

Rocky Mountain High School Ventilation Improvement
Renovation
Results
$419,914 CJ est. value
Cowley, WY 82420

Waste Water Collections Building HVAC Upgrades
Renovation
Sub-Bidding
$460,000 CJ est. value
Casper, WY 82609

Replace the Pneumatic HVAC controls
Alteration
Post-Bid
Cody, WY 82414

Sheridan College Whitney Center for the Arts IT Core ACU-2 Replacement
Renovation
Results
$245,735 CJ est. value
Sheridan, WY 82801

Chiller Removal and Replacement
Renovation
Sub-Bidding
$80,000 CJ est. value
Cheyenne, WY 82009

Cooling Upgrades
Term Contract
Post-Bid
Casper, WY 82601

UW Cheyenne Family Medicine Clinic - Temperature Controls Upgrades
Alteration
Post-Bid
Laramie, WY 82071

Last Updated 03/13/2023 11:32 PM
Project Title

Boiler System Replacement - Carpenter Elementary School

Physical Address View project details and contacts
City, State (County) Carpenter, WY 82054   (Laramie County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $204,088 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removing the existing heating water plant at Carpenter Elementary School and installing new gas-fired condensing boilers, boiler pumps, hydronic system pumps, air separator, expansion tank, chemical bypass feeder, and temperature controls. The new boiler system shall be tied into the existing DDC system. Miscellaneous roof and wall cutting/patching are required for the project. The prime mechanical contractor shall employ a licensed general contractor and qualified roofing contractor for this work. Question Deadline 02/01/2023 at 10:00 AM MT

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents