Similar Projects
Last Updated | 03/13/2023 11:32 PM |
Project Title | Boiler System Replacement - Carpenter Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Carpenter, WY 82054 (Laramie County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $204,088 [brand] Estimate |
Plans Available from | Mechanical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of removing the existing heating water plant at Carpenter Elementary School and installing new gas-fired condensing boilers, boiler pumps, hydronic system pumps, air separator, expansion tank, chemical bypass feeder, and temperature controls. The new boiler system shall be tied into the existing DDC system. Miscellaneous roof and wall cutting/patching are required for the project. The prime mechanical contractor shall employ a licensed general contractor and qualified roofing contractor for this work. Question Deadline 02/01/2023 at 10:00 AM MT |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |