Similar Projects
Highpointe PUD
New Construction - 588,000 SF
Design
Stuart, FL 34997

Palm Pike Crossing - Site Development
New Construction
Design
Palm City, FL 34990

Old Palm City Septic to Sewer Conversion and Water Main Extensions
Infrastructure
Bidding
$28,870,000 est. value
Stuart, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Citrus Boulevard Force Main and Wain Extension
Infrastructure
Post-Bid
$1,800,000 est. value
Palm City, FL 34990

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Performance Based Facilities Maintenance
Infrastructure
Post-Bid

Add Lanes and Reconstruct
Results
Less than $21,311,782 est. value
Palm City, FL 34990

Street Sweeping Vacuum Services
Term Contract
Post-Bid
Sewall's Point, FL

Culpepper Ranch Phase II Berm
Results
Less than $782,520 est. value
Stuart, FL 34996

Annual Contract for Street Sweeping Services
Term Contract
Post-Bid
Stuart, FL

CR-A1A/Dixie Highway Resurfacing (Southeast Indian Street to Southeast Jefferson Street)
Results
Less than $2,300,000 est. value
Stuart, FL 34994

Kanner Highway Mixed Use - Phase IA - Site Development
Infrastructure
Post-Bid
$7,529,703 est. value
Stuart, FL 34994

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Last Updated 07/22/2022 09:34 AM
Project Title

Hobe Hills Neighborhood Restoration - 101759 - Martin County

Physical Address View project details and contacts
City, State (County) Hobe Sound, FL 33455   (Martin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,150,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Infrastructure Reinvestment Program project includes the replacement of drainage structures, regrading of drainage swales, pavement milling & resurfacing, and replacement of sidewalk & other ancillary items within the neighborhood. This project completes the neighborhood restoration of the Hobe Hills subdivision. As of January 13, 2022, this project is currently in the FY 2022-2031 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents