Similar Projects
Calas Park And Foisia Park Roof Repair - PW1416
Renovation, Alteration
Conception
$492,495 est. value
Carson, CA

Contractor - FY22 Angeles National Forest Roofing Project
Alteration
Design
$700,000 est. value
San Fernando, CA 91342

City Hall and Public Works Department Roof Repair
Renovation
Sub-Bidding
$49,500 CJ est. value
Lawndale, CA 90260

Library Roof
Renovation
Sub-Bidding
$200,000 CJ est. value
Alhambra, CA 91801

Roof Encapsulation of Buildings at the Joint Water Pollution Control Plant
Alteration
Post-Bid
Carson, CA

Portable Buildings Roofing Project
Alteration
Post-Bid
Torrance, CA 90504

Repair Building Roof
Alteration
Results
$2,300,000 est. value
CA

Regional Specialty Roofing Job Order Contract
Alteration
Results
$500,000 est. value
Long Beach, CA

Roofing for Various Burbank Water and Power (BWP) Buildings
Term Contract
Sub-Bidding
Burbank, CA 91502

Roof Replacement, Art Center, Building 1A
Term Contract
Post-Bid
$490,000 est. value
CA

Orchard Dale Elementary School Modernization Project- Roofing/Sheet Metal
Alteration
Results
Whittier, CA 90603

Los Angeles Center for Enriched Studies
Renovation
Sub-Bidding
$709,000 CJ est. value
Los Angeles, CA 90035

Reservoir No. 7 Roof Replacement
Alteration
Post-Bid
$600,000 est. value
La Canada Flintridge, CA 91011

Roof Repair and Replacement Services
Alteration
Results
CA

RFQ Contractor - Athletics Modular Roof Replacement
Renovation
Sub-Bidding
$240,750 CJ est. value
Walnut, CA 91789

Last Updated 10/14/2022 05:32 PM
Project Title

Roof Replacement, Math and Science, Building 61

Physical Address View project details and contacts
City, State (County) Walnut, CA 91789   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $376,627 [brand] Estimate
Plans Available from Architect - 07/26/22
Owner View project details and contacts
Architect View project details and contacts
Description

For Roof Replacement, Math and Science, Building 61 Pre-bid RFI's are due under the Q&A tab by 2:00pm on August 8, 2022. Bids shall be valid for minimum of ninety (90) days after the Bid Deadline. Bids must be accompanied by cash, a certified or cashier's check, or a bid bond in favor of the Owner in an amount not less than ten percent (10%) of the submitted total bid price. The successful bidder will be required to furnish a performance bond and a payment bond, each in the amount of one hundred percent (100%) of the total bid price in the manner described in the Owner Documents. Bidders shall comply with California Public Contract Code Section 4108 with respect to subcontractor bond requirements. NOTE: Material lead times are six to nine months. Project is schedule to be completed during the summer break of 2023 DIR Registration. Each Bidder submitting a proposal to complete the work, labor, materials, and/or services ("Work") subject to this procurement must be registered with the Department of Industrial Relations pursuant to Labor Code 1725.5. A Bidder who is not a DIR Registered Contractor when submitting a proposal for the Work is deemed "not qualified" and the proposal of such a Bidder will be rejected for non-responsiveness. Pursuant to Labor Code1725.5, all Subcontractors identified in a Bidder's Subcontractors' List shall also be DIR Registered Contractors. This project requires that the Contractor and any subcontractor(s) shall pay not less than the prevailing rates of wages to all workers employed by them in the execution of the contract. Copies of schedules of rates so determined are on file in the Purchasing Office and are available to any interested party upon request. Pursuant to Labor Code 1771.4(a)(4), Prevailing Wage Rate monitoring and enforcement shall be by the Department of Industrial Relations. In accordance with provisions of Public Contract Code Section 223000, substitution of eligible and equivalent securities for any monies withheld to ensure performance under this contract will be permitted at the request and expense of the Contractor. The District reserves the right: (1) to accept or reject any and all bids, (2) to waive any irregularities in the bids or bidding, (3) to be sole judge as to the merit, quality, and acceptability of materials proposed and their compliance to the specifications which in their opinion will best serve the interest of the District. Delayed Completion of the Work. The Contractor shall be subject to the assessment of Liquidated Damages for failure to achieve Final Completion of the Work within the Contract Time as indicated in item 1a, above. Liquidated Damages shall be at the rate of $1000 per day until Final Completion of the work is achieved

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents