Similar Projects
UV Replacement at Kindergarten Center, Washington, Lincoln, and Union School
Renovation
Sub-Bidding
$1,296,000 CJ est. value
Rutherford, NJ 07070

Boiler Breeching Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Little Ferry, NJ 07643

Alpine School District Unit Ventilator Replacement
Renovation
Post-Bid
$623,000 CJ est. value
Alpine, NJ 07620

Boiler Replacement at Cherry Hill Elementary School and Roosevelt Elementary School
Renovation
Post-Bid
$3,130,000 CJ est. value
River Edge, NJ 07661

East Rutherford Meadowlands Arena Cooling Tower Plant Motor Control Center Replacement/CN-254
Renovation
Results
$296,079 CJ est. value
East Rutherford, NJ 07073

Boiler Replacement at Lindbergh Elementary School
Renovation - 86,420 SF
Results
$894,400 CJ est. value
Palisades Park, NJ 07650

HVAC Improvements - BC LPSI
Renovation
Sub-Bidding
$300,000 CJ est. value
Mahwah, NJ 07430

Heating, Ventilating and Air Conditioning Service and Repair Work
Term Contract
Post-Bid
Demarest, NJ

HVAC Upgrades at Palisades Park Junior/Senior High School
Renovation
Results
$3,680,000 CJ est. value
Palisades Park, NJ 07650

Cooling Tower Replacement at the Teaneck Public Library
Alteration
Post-Bid
$60,000 est. value
Teaneck, NJ 07666

HVAC Upgrades at Dr. Charles R. Smith Early Childhood Center
Renovation - 12,970 SF
Results
$749,000 CJ est. value
Palisades Park, NJ 07650

HVAC Systems Maintenance and Service
Term Contract
Post-Bid
Lyndhurst, NJ 07071

Rooftop Unit (RTU) Replacement at Building 3
Renovation
Results
$180,850 CJ est. value
Wyckoff, NJ 07481

Time and Materials - Air Conditioning Units, Service and Repair-Package #1
Term Contract
Post-Bid
Saddle Brook, NJ 07663

Auditorium HVAC Upgrades at Paramus High School
Renovation
Results
$834,000 CJ est. value
Paramus, NJ 07652

Last Updated 10/16/2023 01:04 AM
Project Title

Eleanor Van Gelder School HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Edgewater, NJ 07020   (Bergen County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Removal and replacement of HV units with Vertical HVAC Units and Boiler replacement. SF 78549 Type of Contract: 1. Project will be constructed under a single prime contract. All bidders must use and complete all bid forms provided in the manner designated and must comply with all requirements contained in the instructions and specifications. Bids shall be placed in a sealed envelope with the name of the project clearly marked on the front of the envelope and accompanied by a bid guarantee in the form of a Certified Check, Cashierís Check, or Bid Bond in the amount of Ten Percent 10% of the bid, but not more than $20,000. Project Substantial Completion: Work will commence within Ten (10) Calendar Days after receipt of written "Notice to Proceed" and be substantially completed in accordance with the Contract Documents and Contractorís Construction Schedule for substantial completion of the entire project including a Certificate of Occupancy for the entire building by August 30, 2024. All time limits stated in the Contract are of the essence. Should you have any questions, please contact the Architectís office at 866-974-7666. The Owner reserves the right to reject all bids and waive any minor informality in the bidding process in accordance with the law, if it is in the best interest of the Owner.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents