Similar Projects
Last Updated | 04/24/2021 04:53 AM |
Project Title | District 3, Buckley Maintenance Facility |
Physical Address | View project details and contacts |
City, State (County) | IL (Iroquois County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This work is located at the Illinois Department of Transpiration, District 3, Buckley Maintenance Facility in Iroquois County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a polymer HMA asphalt binder cse. (2ΒΌ" lift) and a polymer HMA surface. 35800100 Sq Yd Preparation Of Base Base Items 818.000 40600290 Pound Bituminous Materials (Tack Coat) Base Items 5,022.000 40600906 Ton Polymerized Hot-Mix Asphalt Binder Course (Hand Method), n70 Base Items 5.000 40600990 Sq Yd Temporary Ramp Base Items 174.000 40603235 Ton Polymerized Hot-Mix Asphalt Binder Course, Il-19.0, n70 Base Items 1,042.000 40604152 Ton Polymerized Hot-Mix Asphalt Surface Course, Il-9.5, Mix "c", n70 Base Items 625.000 67100100 l Sum Mobilization Base Items 1.000 70100450 l Sum Traffic Control And Protection, Standard 701201 Base Items 1.000 x0320050 l Sum Construction Layout (Special) Base Items 1.000 x4400196 Sq Yd Hot-Mix Asphalt Surface Removal, Special Base Items 7,485.000 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |