Similar Projects
Last Updated | 09/15/2023 04:14 PM |
Project Title | Airline Ticket Office and Baggage Handling System Expansion Phase 1 and Central Energy Plant Replacement |
Physical Address | View project details and contacts |
City, State (County) | Gainesville, FL 32609 (Alachua County) |
Category(s) | Heavy and Highway, Sewer and Water, Transportation |
Sub-Category(s) | Airline/Passenger Terminal, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $7,941,701 [brand] Estimate |
Plans Available from | Civil Engineer - 05/22/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | FDOT FPID: 438739-1 & 442046-1 FAA AIP: 3-12-0028-05X-2023 The "Airline Ticket Office and Baggage Handling System Expansion - Phase 1" work shall include the renovation and expansion of the Airline Ticket Offices (ATO) and the construction of a new outbound Baggage Handling System (BHS). The BHS work will consist of ticket counter conveyors, transport conveyors, a slope-plate make-up unit, and maintenance catwalk. The ATO work will include renovation and new construction of walls, ceilings, flooring, finishes, millwork, plumbing, mechanical HVAC, electrical, access control, CCTV, and a structural steel canopy with an exterior metal framed, perforated tensioned fabric screening system to cover the new BHS and related work. The project also includes site work that will include clearing and grubbing, miscellaneous demolition, new concrete foundations and slabs, asphalt road construction, site lighting, drainage, excavation and embankment, pavement marking, fencing, site access control, site CCTV, landscaping/irrigation, a temporary office trailer, a backup generator and related work. The "Central Energy Plant Replacement" work shall include the replacement of two (2) air-cooled chillers, primary and secondary chilled water pumps, and HVAC controls modifications. The existing hot water heating system boiler shall be replaced with two (2) high efficiency condensing boilers. The hot water distribution pumps will be replaced with variable speed pumps to match the increased capacity of the boilers. GACRAA reserves the right to reject any or all bids received in response to this Request for Bids as determined to be in the best interest of the Airport. Additional site visits will be arranged after the pre-bid meeting. The meeting will be held in person and/or as a Teams meeting for anyone who wishes to attend virtually. Contact Bill Prange prior to May 30, 2023 to receive the Teams meeting invitation, bill.prange@aecom.com. This project will require badging, Davis Bacon Wages, and bids to be good for 120 days. As of June 23, 2023, Addendum 2 has been released with an estimated project value with alternates of $2,111,587.50. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |