Similar Projects
Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

On Call Contractor Services for Treatment Plant
Term Contract
Post-Bid
Wichita, KS

2022 Wastewater Treatment Facility Improvements
Renovation
Results
$2,601,500 est. value
Osawatomie, KS 66064

Turkey Creek WWTF Miscellaneous Improvements
Renovation
Results
Mission, KS 66202

Wastewater Treatment Plant Scada Controls & Instrumentation Maintenance NBAF
Renovation
Post-Bid
Manhattan, KS 66506

Operation and Maintenance for Oakland RNG Pipeline
Renovation
Post-Bid
Topeka, KS

SCADA System Maintenance and Integration Services
Term Contract
Post-Bid
Overland Park, KS 66224

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Last Updated 04/27/2022 01:08 PM
Project Title

Water Treatment West Plant Basin Rehabilitation

Physical Address View project details and contacts
City, State (County) Topeka, KS 66606   (Shawnee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace clarifier equipment in the Polymer Settling Basin, Presedimentation Basin, and Primary Clarifiers; install clarifier equipment in the Secondary Clarifier (bid alternative); replace vertical mixers in the Primary Flocculation Basin; replace troughs and weirs; replace baffle walls (partial); miscellaneous heating, ventilating and plumbing improvements; related electrical, instrumentation, and sitework improvements; drain line cleaning and inspection, and; concrete rehabilitation.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents