Similar Projects
Project Luna / 1111 Akron Way
New Construction, Infrastructure
Design
$33,000,000 CJ est. value
Forney, TX 75126

Forney Marketplace - Lot 8
New Construction, Infrastructure - 8,400 SF
Design
$1,848,000 est. value
Forney, TX 75126

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Talty Municipal Facility
New Construction, Infrastructure
Bidding
$4,800,000 CJ est. value
Talty, TX 75160

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Approximately 13,600 LF Rubblizing of Existing Concrete Pavement at Kaufman County Road 4106
Infrastructure
Post-Bid
TX

Windmill Farms Walden Pond Water Line Extension
Results
TX

Fox Run Reconstruction
Infrastructure
Results
Crandall, TX 75114

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Lions Den Self Storage Phase 2
New Construction, Infrastructure - 23,200 SF
Design
$696,000 CJ est. value
Kaufman, TX 75142

Lake Ray Hubbard Drive Turn Lane
Infrastructure
Post-Bid
Forney, TX 75126

Parking Lot Expansion at Terrell Health Science Center (HSC)
Infrastructure
Results
Terrell, TX 75160

Business Park / Forney
New Construction, Infrastructure - 1,100,000 SF
Pending Verification
$46,000,000 CJ est. value
Forney, TX 75126

South Pointe Park at Kaufman Sports Village Addition
New Construction, Infrastructure - 147,100 SF
Design
$130,000,000 CJ est. value
Kaufman, TX 75142

Last Updated 12/23/2022 09:31 AM
Project Title

Interim Wastewater Treatment Plant Phase 1 - Lease

Physical Address View project details and contacts
City, State (County) Terrell, TX 75160   (Kaufman County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,612,500 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project location: Project site is located at the intersection of Spur 557 and U.S. Highway 80 on the north side of U.S. Highway 80, in Kaufman County, Texas. Project scope shall include the assembly of a steel package wastewater treatment plant; installation of equipment and associated electrical components; yard piping; fence and construction of on-site lift station. Project scope shall include furnishing and delivering a 100,000 gpd wastewater treatment plant; plant components include two (2) 52-ft rectangular basins for aeration and aerobic digestion; one (1) 40-ft diameter clarifier; one (1) 32-ft rectangular basin for chlorine contact; and all ancillary equipment and associated electrical components, including but not limited to, two (2) positive displacement blowers, all air drop diffusers, air lift pumps, piping, non-potable water system, bar screen, handrails and walkways, etc.; facility must be able to achieve a wastewater effluent with the following parameters: CBOD5 of 10 mg/l; TSS of 15 mg/l; NH3-N of 3 mg/l; and less than 126 MPN/100 ml E. coli. The above described construction will be performed in accordance with plans and specifications and any addenda thereto which may be issued prior to the opening of bids. P-4204 TBPLS No. 10092300 TBPE No. F-726 Each Bid must be accompanied by a Certified or Cashier's Check, from a responsible bank in the State of Texas, or a Bid Bond, issued by a surety legally authorized to do business in the State of Texas, equal to two percent (2%) of the total bid amount. Make the Cashier's Check, Certified Check or Bid Bond payable to the Owner. The Owner reserves the right to reject any or all bids or to accept any bid deemed advantageous to it and waive informalities in bidding. All bids received after the closing time above designated will be returned unopened. Project location: Project site is located at the intersection of Spur 557 and U.S. Highway 80 on the north side of U.S. Highway 80, in Kaufman County, Texas.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents