Similar Projects
Streetscape And Road Improvements - West Avenue, Quincy, Orchard And Butler Streets - City of Norwalk
Infrastructure
Conception
$1,100,000 est. value
Norwalk, CT

East Avenue Roadway And Bridge Reconstruction - City of Norwalk
Renovation, Infrastructure
Conception
$4,273,000 est. value
Norwalk, CT 06854

Surf Avenue Multi-Residential
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Stratford, CT 06615

Langankes Landing
New Construction, Infrastructure - 4,200 SF
Design
$3,000,000 CJ est. value
Shelton, CT 06484

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Sanitary Sewer Contract 75
Infrastructure
Bidding
$200,000 CJ est. value
Westport, CT 06880

Median Reconstruction and Resurfacing of I-95 in Norwalk and Westport
Infrastructure
Post-Bid
$60,000,000 to $89,999,999 est. value
Norwalk, Westport, CT

Snow Plowing Services and Equipment Rental
Infrastructure
Post-Bid
Shelton, CT

Pavement Preservation and Repairs - Spring 2021
Results
Westport, CT

Bituminous Concrete Paving Improvements Summer / Fall 2021
Infrastructure
Results
Weston, CT

141 Danbury Road Apartments
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Wilton, CT 06897

141 Danbury Road Apartments
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Wilton, CT 06897

Danbury Proton
New Construction, Infrastructure - 14,400 SF
Pending Verification
$80,000,000 CJ est. value
Danbury, CT 06810

Parklands Drive Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$22,600,000 CJ est. value
Darien, CT 06820

Wall Street Area Sidewalk And Historic Street Light Project - City of Norwalk
Alteration
Conception
$425,000 est. value
Norwalk, CT

Last Updated 01/04/2023 01:36 PM
Project Title

Combined Use Path Ligi Way and Farmingville Road

Physical Address View project details and contacts
City, State (County) Ridgefield, CT 06877   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.mrt.com/news/article/Ridgefield-to-construct-trail-along-Ligi-s-Way-17658913.php Ridgefield to build half-mile trail on Ligi's Way 'to develop the pedestrian network' in town RIDGEFIELD -- The town plans to soon begin building a trail along Ligi's Way with a goal to encourage walking, jogging and bird watching. The project includes the design and construction of about 2,510 feet of an 8-foot-wide walkway along Farmingville Road and Ligi's Way. "It will definitely be a big project for next year," Ridgefield First Selectman Rudy Marconi said. When completed, "it will provide a unique area to look out over the Great Swamp for bird watching," he said. "It's great to see us continue to develop the pedestrian network in Ridgefield," said Robert Hendrick, chairman of the town Planning & Zoning Commission. "That's one of the major goals of our Plan of Conservation and Development for the community -- to increase pedestrian opportunities in Ridgefield. This is a big step along that way." According to the project site plans, it will include a wooden boardwalk and a 60-foot prefabricated steel pedestrian bridge. The nearly half-mile walkway will begin at Danbury Road and Farmingville Road, then extend along Farmingville Road and Ligi's Way, and end at Ligi's Way and South Street. "You walk down Farmingville to the intersection of Ligi's Way, cross the street and walk the boardwalk the entire length of Ligi's Way," Marconi said. "Then you would walk in front of ROAR (Ridgefield Operation Animal Rescue), in front of the recycling area, in front of the fuel depot. In front of the Goodwill trailer -- there'll be a new sidewalk all along there -- and you'll go into the woods behind the Goodwill trailer." Ligi's Way, which was previously called Bypass Road, was renamed after Ridgefield Police Chief Richard Ligi, who died in 2008 at age 60. The area, which the town owns, is now all woods. The first step in the project will be to create the boardwalk, which will be about 1,600 feet long. "The proposed wooden boardwalk along Ligi Way is to minimize wetland disruption and keep all work within town of Ridgefield right-of-way. ... The continuation of this path under future phases will directly connect to the existing Rails-to-Trails walkway leading to the Branchville section of Ridgefield," the site plan says. When the project is done, the town will probably dedicate additional parking for it, Marconi said. Construction could also cause some traffic delays, he said. The project, which was initially expected to take place during the summer of 2021, was delayed due to a supply chain shortage. "During COVID, the price of lumber skyrocketed. We didn't have any bids so we had to rebid the project," said Marconi, adding that he doesn't yet know the cost of the project or the timeline. The funds will come from the Local Transportation Capital Improvement Program, which provides state funds to urbanized area municipal governments in lieu of federal funds otherwise available through federal transportation legislation. __________________ State Project No. L117-0001 Branchville TOD Pedestrian Improvements State Federal ProjectTerms and conditions as well as the description. Questions should be sent to Jacob Muller, Purchasing Director at purchasing@ridgefieldct.org. A pre-bid walk through will not be held, however, bidders are highly encouraged to visit the project site and familiarize themselves with the project area prior to submission of their bid. Each bidder will be required to submit to the Office of the Director of Purchasing, their original proposal with a bid bond or cashier's check in the amount of ten percent (10%) of the base bid. Each bidder shall honor the bid price for ninety (90) business days from the date of the bid opening, without modification. Upon award of the bid, the lowest responsible bidder shall be bound by the bid proposal price throughout the contract period. The minimum rates to be paid for labor on various classifications of the project shall be in accordance with the current schedule of prevailing wages established by the Federal Department of Labor (Davis-Bacon Act) and the Connecticut Department of Labor, Wage and Workplace Standards Division. Refer to the prevailing wage rates included within the specifications. The bidder agrees that 10% of the final contract value shall be performed by Disadvantaged Enterprise Enterprises (DBE) certified by the Connecticut Department of Transportation as a sub-contractor or owner-operator of construction equipment. The Bidder must indicate with their Bid the DBE firms(s) it intends to utilize to meet the above stated percentage and submit the Pre-Award DBE Commitment Approval Request with the bid forms. The Town of Ridgefield reserves the right to reject any or all bids; or to waive defects in same, if it deems such to be in the best interest of the Town. The Town of Ridgefield is an affirmative action, equal opportunity employer. The work to be done consists of the furnishing of all labor, materials, tools, and equipment necessary to construct the project as shown on the plans and as described in the specifications prepared by Tighe & Bond, Inc

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents