Similar Projects
RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Puncheon Run Transmission Bypass - Kent County
Infrastructure
Conception
$2,600,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

Commerce Way Warehouse/ Modani Dover
New Construction, Infrastructure - 234,000 SF
Design
$25,516,900 CJ est. value
Dover, DE 19904

Parking Lot Asphalt at the DSHS Division of Communications Administration Building
Infrastructure
Bidding
$800,000 CJ est. value
Dover, DE 19904

Parking Lot Asphalt at the DSHS Division of Communications Administration Building
Infrastructure
Bidding
$800,000 CJ est. value
Dover, DE 19904

Duck Creek Regional Library
Addition, Renovation, Infrastructure
Sub-Bidding
$6,300,000 CJ est. value
Smyrna, DE 19977

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

Pavement and Rehabilitation, Kent I, (US13, South Dupont Hwy - Harrington To Woodside) 2021
Infrastructure
Results
DE

Interstate 295 Miscellaneous Roadway Improvements
Infrastructure
Results

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

1165 South DuPont Boulevard Mixed Use Development
New Construction, Infrastructure - 57,600 SF
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

Critical Capital Needs/Deferred Maintenance - Delaware Technical Community College
Addition, Demolition, Infrastructure, Renovation
Conception
$33,451,000 CJ est. value
Dover, DE 19904

Bowers Beach Parking Area Improvements - Phase 2
Infrastructure
Bidding
$591,000 CJ est. value
Frederica, DE 19946

Last Updated 08/17/2023 09:06 AM
Project Title

Pavement and Rehabilitation, Kent I, (Felton Area), 2023

Physical Address View project details and contacts
City, State (County) Woodside, DE 19980   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Improvements Consist of Furnishing All Labor and Materials for Pavement Milling Bituminous Concrete Pavement, Bituminous Concrete Patching, Pcc Patching, Bituminous Concrete Superpave Type C Overlays, Pcc Curb and Sidewalk, Guardrail, Signing and Pavement Markings for Kc-00289-f Hopkins Cemetery Road, Kc00371-f Barratts Chapel Road, Kc-00426-f Paradise Alley Road, and Kc-00057-f Main Street (Felton). Follow Other Incidental Construction in Accordance With the Location, Notes and Details Shown on The Plans, and as Directed by the Engineer. Pre-bid Meeting: No Performance-based Rating System - 29 Del.c. 6962 (C)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a Prequalification to Bid at the Time of Bid. Refer to 'general Notices' for Details. Completion Time: All work on this contract must be complete within 161 Calendar Days. Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days. It is estimated a Notice to Proceed is issued such that work starts on or about November 13, 2023. Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Please include the Contract number in the subject line. Questions and responses are posted at bids.delaware.gov, and bidx.com/de/. The date of the final posted Questions and Answers document must be entered on the submitted Certification Form. Surety Bond - Each Proposal Must Be Accompanied by a Deposit of Either Surety Bond or Security for a Sum Equal To at Least 10% of the Amount Bid. DEDOT - Pavement and Rehabilitation, Kent I, (Felton Area), 2023

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents