Similar Projects
Admiral East
New Construction - 16,000 SF
Conception
Fayetteville, AR

Ellis Estates
New Construction, Infrastructure
Conception
$15,750,000 CJ est. value
Fayetteville, AR 72703

JA Riggs Facility Expansion
New Construction, Infrastructure - 10,112 SF
Design
$2,700,000 CJ est. value
Springdale, AR 72762

Parsons Stadium Expansion
Addition, New Construction, Renovation, Infrastructure
Design
$12,000,000 CJ est. value
Springdale, AR 72764

RFQ Contractor - Construct New Water Storage Facility
Demolition, New Construction, Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Fayetteville, AR 72703

RFQ Contractor - Correct Security Deficiencies
Infrastructure
Bidding
$300,000 CJ est. value
Fayetteville, AR 72703

Washington County Quarantine Addition
Addition, Demolition, Infrastructure - 36,975 SF
Sub-Bidding
$12,505,000 CJ est. value
Fayetteville, AR 72701

Moderate Rehabilitation of a Residential Building
Renovation
Post-Bid
Fayetteville, AR

Moderate Rehabilitation of a Residential Building
Renovation
Post-Bid
Fayetteville, AR

Lee Creek Stream Restoration at Devil's Den State Park
Infrastructure
Results
$430,000 CJ est. value
West Fork, AR 72774

Highway 412 Water East Improvements
Infrastructure
Results
$3,069,050 CJ est. value
Tontitown, AR 72762

Aiden's Place
New Construction
Construction
Fayetteville, AR 72704

University of Arkansas Anthony Timberlands Center for Design and Materials Innovation
LEED Certification, New Construction, Infrastructure - 45,000 SF
Construction
$26,500,000 CJ est. value
Fayetteville, AR 72701

Markham Cottages
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fayetteville, AR 72701

Markham Cottages
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fayetteville, AR 72701

Last Updated 01/18/2023 08:37 AM
Project Title

Riverwalk Subdivision Phase IV

Physical Address View project details and contacts
City, State (County) Fayetteville, AR 72701   (Washington County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $13,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 34 lot residential subdivision. As of January 18, 2023, this project is in the early planning stages, and received final plat approval from the Fayetteville Planning Commission. A builder has been selected. A firm construction timeline has not been announced.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents