Similar Projects
Byrd Park Reservoir Rehabilitation
Alteration
Bidding
Richmond, VA 23220

Water Treatment Plant Roof Replacement
Alteration
Bidding
Danville, VA 24541

Roofing MACC
Post-Bid

Roofing MACC
Post-Bid

Farmington Elementary School Roof Replacement
Results
Culpeper, VA 22701

Replace Roof WH44
Results
$1,000,000 to $5,000,000 est. value
Richmond, VA 23113

Berkeley Middle School HVAC Replacement and Roof Repair
Alteration
Bidding
Williamsburg, VA 23188

Roofing IDIQ for NRDE Commands at NAS Patuxent River, NSF Indian Head and NSF DAHLG
Post-Bid
Less than $25,000,000 est. value
Indian Head, MD - Dahlgren, VA 20670

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

St. Charles Elementary School Roof Replacement
Alteration
Bidding
Saint Charles, VA 24282

Roof Replacement Montvale Library
Renovation - 15,060 SF
Post-Bid
Montvale, VA 24122

The Federal Aviation Administration (FAA) has a Requirement to Replace the Equipment Building Roof, the Breezeway Roof, Repave the Access Road, & Other Miscellaneous Work at the QBE ARSR Located in Bedford
Results
$175,000 to $265,000 est. value
Bedford, VA

Roof Rehabilation Project at Colonial Heights High School
Alteration
Bidding
Colonial Heights, VA 23834

Windsor High School Re-Roofing Project
Post-Bid
Windsor, VA 23487

Roof Replacement Project at Grove Park Preschool
Results
Danville, VA

Last Updated 02/01/2022 12:19 PM
Project Title

Roof Replacement for Mary W. Jackson Elementary School (Formerly Tucker-Capps Elementary)

Physical Address View project details and contacts
City, State (County) Hampton, VA 23666   (Hampton City County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Work of Project is defined by the Contract Documents and consists of the following: B. The project is located at Tucker-Capps Elementary School on 113 Wellington Drive. The scope of work consists of removal of the existing gravel surfaced built-up roof, modified bitumen, and EPDM roof systems complete, including the existing insulation and gravel, down to the existing structural roof deck. The new roof system shall include a reinforced single-ply 60 mil PVC membrane fully adhered to a ½” gypsum cover board. The cover board shall be full adhered to rigid board poly-isocyanurate insulation below. The scope of work includes the removal of the existing skylights and installation of roof deck infill. All mechanical equipment shall remain as at present. Existing penetrations located on the roof shall be raised or lengthened as required and reset. Demolish existing roof drains. Cap existing piping below deck. Infill existing openings in metal deck. The roof hatch shall be replaced. New scuppers, flashing, curbs, premanufactured edge metal system, and other accessories as detailed shall be provided. The existing rooftop ladder shall be repainted. Existing suspended ceilings shall be removed and reinstalled where required.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes, Painting, Exterior Painting.
Division 22 - Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents