Project Title | RFQ Construction Manager at Risk - Central Mesa Reuse Pipeline - Plant Improvements |
Physical Address | View project details and contacts |
City, State (County) | Mesa, AZ 85201 (Maricopa County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant, Site Development |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Request for Qualifications, Design Development, Construction start expected May 2024 |
Bids Due | View project details and contacts |
Estimated Value | $20,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The owner has selected a Construction Manager. A timeline for construction has not yet been established. The City of Mesa is seeking a qualified Construction Manager at Risk (CMAR) to provide Pre-Construction Services and complete Construction Services as the CMAR for the Central Mesa Reuse Pipeline - Plant Improvements project. The City of Mesa is proposing various improvements related to plant work associated with the Central Mesa Reuse Pipeline. This work includes the construction of upgrades, replacements, or new equipment associated with delivery of reclaimed water from the Northwest Water Reclamation Plant (NWWRP), the Southeast Water Reclamation Plant (SEWRP), and the Greenfield Water Reclamation Plant (GWRP) to the Gila River Indian Community (GRIC). These improvements may include: Pump station improvements at the NWWRP Construction of a new Intermediate Pump Station (IPS) including a storage reservoir and booster pump facility near the intersection of Val Vista Drive and Thomas Road Pump station improvements at the SEWRP Piping improvements for the SEWRP East Maricopa Floodway discharge (EMF) south of E. Baseline Rd. Piping and pump station improvements at the GWRP Piping improvements at the reuse water discharge location near Val Vista Drive and Hunt Highway Other associated improvements as required. The estimated construction cost is between $18 and $20 million including utility improvements, utility relocations and other ancillary costs. The City anticipates this project to consist of multiple GMP's with the first construction to commence in the winter of 2023. The City has entered into a professional services contract with Black and Veatch Corporation to design these improvements. The CMAR shall work closely with and be an integral part of this project team during the design and construction phases of the project. It is anticipated that the Construction Manager at Risk shall participate in Pre-Construction Services and Construction Services for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |