Similar Projects
Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Hotchkiss Road Hot Mix Asphalt & Shouldering
Post-Bid
Strum, WI 54770

Galesville - Whitehall, STH 95 East Junction
Results
Galesville, Whitehall, WI 54630

Thompson Road Hot Mix Asphalt & Shouldering
Renovation
Post-Bid
Strum, WI

Centerville - Independence, STH 35 to Swenson Lane
Results
Centerville, Independence, WI

Baertsch Court Road Reconstruction / Resurfacing
Post-Bid
Fountain City, WI

Reconstruction/Resurfacing Bids
Renovation
Results
Alma, WI 54610

Complete Pulverize and Re-Pave of 3.39 Miles of Road
Post-Bid
WI

Road Improvements
Results
Eleva, WI

Bremer Ridge Road Hot Mix Blacktop
Post-Bid
WI 54612

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Thompson Road Improvements
Post-Bid
WI

Last Updated 05/15/2021 01:30 AM
Project Title

Trempealeau - Fountain City, Tremp River E. Channel Bridge

Physical Address View project details and contacts
City, State (County) Fountain City, Trempealeau, WI (Buffalo, Trempealeau Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 53,309 CY; Excavation Marsh, 2,031 CY; Borrow, 19,496 CY; Backfill Granular, 39,570 Ton; Backfill Structure, 1,220 Ton; Base Aggregate Dense, 31,860 CY; Select Crushed Material, 6,014 CY; Concrete Pavement, 285 SY; Concrete Masonry Bridges, 2,338 CY; Concrete Masonry Seal, 280 CY; Prestressed Girders, 4,272 LF 45-Inch; Bar Steel Reinforcement, 69,700 Lbs; Bar Steel Reinforcement Coated, 389,970 Lbs; Piling CIP Concrete, 4,376 LF 14-Inch, 8,055 LF 14-Inch; Marking Epoxy, 8,880 LF; Construction Staking, 28,928 LF; Construction Staking, 1 Each; Construction Staking, 4 LS; Culvert Pipe, 116 LF 36”; Concrete Curb and Gutter, 162 LF; Beam Guard, 612 LF; Beam Guard Energy Absorbing Terminals, 8 Each; HMA Pavement, 6,130 Ton; Tack Coat, 2,470 Gals; Signs, 87 SF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents