Similar Projects
Sprinkler Upgrade
Post-Bid
Less than $72,500 est. value
Acton, MA 01720

Study, Annual Inspections, and Maintenance of the Existing Fire Alarm System
Term Contract
Post-Bid
Less than $40,000 est. value
Westborough, MA 01581

Dry Fire Protection Sprinkler System Replacement and Wet Pipe Fire Protection System Addition
Results
Less than $265,000 est. value
Chelsea, MA

DMH Taunton State Hospital - Goss Building - Fire Protection Upgrade - General Bid
Results
Less than $1,544,455 est. value
Taunton, MA 02108

Fire Alarm Testing, Maintenance and Repairs Service Contract
Term Contract
Post-Bid
$36,000 to $50,000 est. value
Middleton, MA 01949

Fire Protection Sprinkler System Service
Results
Less than $221,850 est. value
Boston, MA

Sprinkler
Post-Bid
Milford, MA

Gas Protection System Replacement, Phase 1 - Deer Island Treatment Plant
Results
Less than $1,150,000 est. value
Winthrop, MA 02152

Sprinkler
Post-Bid
Framingham, MA

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

Sprinkler
Post-Bid
Norfolk, MA

Fire Suppression System - Data Center / Technical Services
Results
Less than $60,000 est. value
Worcester, MA

Sprinkler
Post-Bid
Milford, MA

Fire Alarm Upgrade, Grove Village 667-2 & Oxford Place 667-3
Results
Less than $642,443 est. value
West Springfield, MA

Sprinkler
Post-Bid
Bridgewater, MA

Last Updated 02/18/2021 11:15 AM
Project Title

McKinley School Community Center 3rd Floor Sprinkler Project

Physical Address View project details and contacts
City, State (County) Rockland, MA 02370   (Plymouth County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $293,497
Plans Available from Municipal Agency - 08/26/20
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required Design and install a complete dry sprinkler system in the 3rd floor of the Town's community center. The work only involves the 3rd floor. The other portions of the building have recently had a new sprinkler system installed. The 3rd floor must integrate and be compatible with this system.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents