Similar Projects
Bridgeland Central - Master Development
New Construction - 506,000 SF
Conception
Cypress, TX 77433

Starbucks - Tenant Improvement
Build-Out - 2,102 SF
Conception
Houston, TX 77044

Starbucks
Renovation - 2,953 SF
Design
$525,000 est. value
Houston, TX 77070

Olive Garden #1074
Renovation - 6,334 SF
Design
$350,000 est. value
Houston, TX 77054

Emergency Operations Center Expansion and Police Department Renovation - Rebid
Addition, Demolition, Renovation, Infrastructure - 8,500 SF
Bidding
$5,240,000 CJ est. value
Deer Park, TX 77536

Target #2419 - Beverage Bar Removal
Renovation, Demolition
Post-Bid
Houston, TX 77082

Benny Thunders Tavern
Renovation - 1,265 SF
Post-Bid
$400,000 est. value
Houston, TX 77007

Wood Leaf Phase 1 Detention & Fill Plan
New Construction
Results
Tomball, TX 77375

Welcome Center Expanded Site Development
Results
Pasadena, TX

O'Reilly Auto Parts (CP3) / Cypress
New Construction, Infrastructure - 7,200 SF
Construction
$1,300,000 CJ est. value
Cypress, TX 77429

Stacked Pickle
Renovation - 4,870 SF
Construction
$654,200 est. value
Houston, TX 77069

Katy ISD Schmalz Elementary School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 20,532 SF
Pending Verification
$7,133,736 CJ est. value
Houston, TX 77084

(H69) 22053 / O'Reilly Auto Parts
New Construction, Infrastructure - 7,453 SF
Pending Verification
$1,000,000 CJ est. value
Houston, TX 77032

Black Rifle Coffee
Build-Out
Conception
Houston, TX

Shipley Do-Nuts
New Construction - 1,941 SF
Design
$240,000 est. value
Houston, TX 77053

Last Updated 09/23/2022 11:13 AM
Project Title

HEB Houston 59 Fresh Initiative

Physical Address View project details and contacts
City, State (County) Cypress, TX 77433   (Harris County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 23 2022 this project is still in late planning. Front end expansion and interior remodel. An architect has been selected. A general contractor has not been released. An actual construction start date has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents